    I agree. I think it should be treated as a typo.
    
    Patti
    
    Patti Iles Aymond, PhD
    Senior Scientist
    Bioterrorism Preparedness & Response
    
    Innovative Emergency Management, Inc.
    Managing Risk in a Complex World
    
    8555 United Plaza Blvd.   Suite 100
    Baton Rouge, LA 70809
    (225) 952-8228 (phone)
    (225) 952-8122 (fax)
    -----Original Message-----
    From: Ham, Gary A [mailto:hamg@BATTELLE.ORG] 
    Sent: Wednesday, February 22, 2006 12:39 PM
    To: Tim Grapes; Elysa Jones; emergency@lists.oasis-open.org
    Subject: RE: [emergency] EDXL-DE Committee Draft
    
    The schema is indeed "normative."   That said, so is the domain model.
    And any difference between the two, therefore, constitutes a typo. is a
    typo.  I say treat it as a typo and let it go.   
    
    R/s
    
    Gary A. Ham 
    Senior Research Scientist
    Battelle Memorial Institute
    540-288-5611 (office)
    703-869-6241 (cell)
    "You would be surprised what you can accomplish when you do not care who
    gets the credit." - Harry S. Truman
    
    -----Original Message-----
    From: Tim Grapes [mailto:tgrapes@evotecinc.com] 
    Sent: Wednesday, February 22, 2006 1:31 PM
    To: 'Elysa Jones'; emergency@lists.oasis-open.org
    Subject: RE: [emergency] EDXL-DE Committee Draft
    
    All,
    Do I correctly recall that our next TC meeting won't be conducted until
    March 9?  If so, I recommend we lay out our cards now in case anyone
    feels the option to pull back and re-publish is warranted.
    
    My input is that this is simply a typo that can be corrected after this
    15-day review.   However, if others feel the error truly is substantive,
    I
    feel we should pull it back, make the correction, and republish ASAP
    rather than incurring an additional 15-day public comment.
    
    Regards,
    
    Tim Grapes
    Evolution Technologies, Inc.
    Disaster Management egov Initiative
    Science and Technology Directorate/OIC
    Department of Homeland Security
    Office:  (703) 654-6075
    Mobile:  (703) 304-4829
    tgrapes@evotecinc.com
    tim.grapes@associates.dhs.gov
     
    -----Original Message-----
    From: Elysa Jones [mailto:ejones@warningsystems.com]
    Sent: Wednesday, February 22, 2006 1:06 PM
    To: emergency@lists.oasis-open.org
    Subject: [emergency] EDXL-DE Committee Draft
    
    TC Members,
    
    As discussed on our call yesterday, there are a couple of issues with
    the EDXL-DE that have been brought to light from within the TC.  We are
    not able to make any changes to the posted documents until after the 15
    day review.  That review is schedule to end March 4.  The only comments
    so far have come from within the TC although I fully expect some
    comments as the end draws near.  The most significant comment is the
    problem with the schema not matching the DOM.  The DOM is correct and
    the place most folks look for understanding of what is presented.
    
    I have discussed our situation with Mary McRae, our OASIS staff contact
    to determine our most efficient method to proceed.  She said that if in
    the mind of the TC, the schema would be considered non-normative, it
    could be changed as any other typo or correction that is non-substantive
    after the 15-day review is complete.
    
    If we do feel that the correction of the schema is substantive, another
    15-day comment period would be required.  In that case, we could pull
    the current 15-day review, make the change and re-publish.  Or we could
    wait until this period is over, make our corrections and re-post for
    another 15-day review.  In either case, the document has to go to OASIS
    by the 15th of the month prior to the month of the vote.  With a
    successful 15-day review in this round, we will be able to submit to
    OASIS by the 15th of March and thus an OASIS wide vote the last 2 weeks
    of April.  A second 15-day review no matter how it happens will postpone
    the OASIS wide vote until the last 2 weeks of May.
    
    That is where we stand now and there is no real need for a decision at
    this point.  Please consider whether you feel the incorrect schema is
    substantive or not and let me know the will of the TC as to how we
    proceed.
    
    Regards,
    Elysa Jones
    Chair, OASIS EM-TC
    Engineering PRogram Manager
    Warning Systems, Inc.
    
    
    
    ---------------------------------------------------------------------
    To unsubscribe from this mail list, you must leave the OASIS TC that
    generates this mail.  You may a link to this group and all your TCs in
    OASIS
    at:
    https://www.oasis-open.org/apps/org/workgroup/portal/my_workgroups.php 
    
    --
    No virus found in this incoming message.
    Checked by AVG Free Edition.
    Version: 7.1.375 / Virus Database: 268.0.0/266 - Release Date: 2/21/2006
     
    
    -- 
    No virus found in this outgoing message.
    Checked by AVG Free Edition.
    Version: 7.1.375 / Virus Database: 268.0.0/266 - Release Date: 2/21/2006
     
    
    
    ---------------------------------------------------------------------
    To unsubscribe from this mail list, you must leave the OASIS TC that
    generates this mail.  You may a link to this group and all your TCs in
    OASIS
    at:
    https://www.oasis-open.org/apps/org/workgroup/portal/my_workgroups.php 
    
    
    ---------------------------------------------------------------------
    To unsubscribe from this mail list, you must leave the OASIS TC that
    generates this mail.  You may a link to this group and all your TCs in
    OASIS
    at:
    https://www.oasis-open.org/apps/org/workgroup/portal/my_workgroups.php 
    
    
    
    IEM CONFIDENTIAL INFORMATION PLEASE READ OUR NOTICE:
    http://www.ieminc.com/e_mail_confidentiality_notice.html
    
    


    [Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]