OASIS Open Document Format for Office Applications (OpenDocument) TC

 View Only
  • 1.  JIRA Work Flow Proposal, was Re: [office] All done

    Posted 05-29-2009 11:48
    To get an understanding what the work flow in JIRA for these issues
    could be now, I've started to add the comments and proposed resolution
    that I have forwarded as documents previously to the items. I have
    entered the proposed resolutions into the "proposal" field. To be able
    to differ between those item where we have a proposed resolution and
    those where we have none, I've set the status of those items where we
    have a proposed resolution to "Resolved". This is the 3rd status in the
    chain "New" -> "Open" -> "Resolved" -> "Applied" -> "Closed".
    
    My proposal how we proceed is:
    
    Whoever has time and and interest may comment on an item, and may
    provide a resolution. This resolution is recorded in the "proposal"
    field. If a proposal for a resolution does exist, the proposer of the
    resolution sets the status of the issue to "resolved".
    
    Patrick (or myself if an issue affects the schema) takes the issues
    whose status is "resolved" and applies the proposed resolution to the
    specification text. He then sets the status to "Applied".
    
    The changes to the specification still will be recorded. We continue to
    have a week for TC internal reviews of drafts before we vote on them in
    a TC meeting, or we conduct electronic ballots for committee drafts, 
    that run at least a week anyway, so that there is the same time 
    available for a review.
    
    TC members therefore have the choice to either watch the items in JIRA,
    or to just review the changes in the next draft. The approval of a
    resolution takes place with the approval of a committee draft. This
    means that nothing that we do in JIRA implies any kind of approval by
    the TC, and that it is not required to watch the changes in JIRA to
    figure out what changes are made in a draft.
    
    When a draft has been approved as committee draft, all issues applied to
    that draft are closed (unless someone has objected to a particular
    resolution).
    
    I have created two new filters:
    
    "Open 1.2 Editorial Notes" lists those items whose title starts with
    "Editorial Notes" and that are open. This filter may be used to find all
    issues for which no resolution does exist yet.
    
    "Resolved, unapplied 1.2 Editorial Notes" lists those items for which a
    resolution has been proposed, and whose status is "resolved". This
    filter is useful if you want to review proposed resolution, but also
    useful for Patrick to find the items that may be ready to be applied to 
    the specification.
    
    Best regards
    
    Michael
    
    
    
    
    
    On 05/28/09 20:05, robert_weir@us.ibm.com wrote:
    > You probably want to delete all of those 260+ notifications from JIRA. 
    > These was a one-time port of Patrick's remaining editor notes. They've 
    > been entered, opened, and assigned to Patrick.  This will make it easier 
    > to track these items going forward.
    > 
    > Regards,
    > 
    > -Rob
    > 
    > 
    > ---------------------------------------------------------------------
    > To unsubscribe from this mail list, you must leave the OASIS TC that
    > generates this mail.  Follow this link to all your TCs in OASIS at:
    > https://www.oasis-open.org/apps/org/workgroup/portal/my_workgroups.php 
    > 
    
    
    -- 
    Michael Brauer, Technical Architect Software Engineering
    StarOffice/OpenOffice.org
    Sun Microsystems GmbH             Nagelsweg 55
    D-20097 Hamburg, Germany          michael.brauer@sun.com
    http://sun.com/staroffice         +49 40 23646 500
    http://blogs.sun.com/GullFOSS
    
    Sitz der Gesellschaft: Sun Microsystems GmbH, Sonnenallee 1,
    	   D-85551 Kirchheim-Heimstetten
    Amtsgericht Muenchen: HRB 161028
    Geschaeftsfuehrer: Thomas Schroeder, Wolfgang Engels, Wolf Frenkel
    Vorsitzender des Aufsichtsrates: Martin Haering
    
    
    


  • 2.  Re: [office] JIRA Work Flow Proposal, was Re: [office] All done

    Posted 05-29-2009 13:04
    This sounds good.  I'd suggest two other possibilities:
    
    1) We probably need a way to suggest that a particular item requires 
    discussion by the TC, because it is a large change or controversial.  JIRA 
    doesn't have  a workflow state that corresponds to this.  So, I think we 
    need to rely on TC members (including Patrick) to nominate items for TC 
    meeting agendas, that they think require additional discussion.  Maybe 
    they also add a comment to the JIRA issue, something we can search for 
    like "Hold for Discussion".  This would indicate that we do not trigger 
    the "Apply" state change until discussed.  Of course, the vast majority of 
    issues are editorial or minor and will require no in depth discussion, and 
    would make it into the proposed CD for review and approval at that time.
    
    2) It is possible that some of the editor notes are found to be invalid, 
    or should be deferred for the next version of ODF.  So it is possible that 
    some comments might not go to the create->open->resolve->apply->close 
    states, but might go directly create->close, or create->assign to 
    ODF-Next.  These will probably be rare.
    
    -Rob
    
    Michael.Brauer@Sun.COM wrote on 05/29/2009 07:47:11 AM:
    > 
    > [office] JIRA Work Flow Proposal, was Re: [office] All done
    > 
    > Sent by:
    > 
    > Michael.Brauer@Sun.COM
    > 
    > To get an understanding what the work flow in JIRA for these issues
    > could be now, I've started to add the comments and proposed resolution
    > that I have forwarded as documents previously to the items. I have
    > entered the proposed resolutions into the "proposal" field. To be able
    > to differ between those item where we have a proposed resolution and
    > those where we have none, I've set the status of those items where we
    > have a proposed resolution to "Resolved". This is the 3rd status in the
    > chain "New" -> "Open" -> "Resolved" -> "Applied" -> "Closed".
    > 
    > My proposal how we proceed is:
    > 
    > Whoever has time and and interest may comment on an item, and may
    > provide a resolution. This resolution is recorded in the "proposal"
    > field. If a proposal for a resolution does exist, the proposer of the
    > resolution sets the status of the issue to "resolved".
    > 
    > Patrick (or myself if an issue affects the schema) takes the issues
    > whose status is "resolved" and applies the proposed resolution to the
    > specification text. He then sets the status to "Applied".
    > 
    > The changes to the specification still will be recorded. We continue to
    > have a week for TC internal reviews of drafts before we vote on them in
    > a TC meeting, or we conduct electronic ballots for committee drafts, 
    > that run at least a week anyway, so that there is the same time 
    > available for a review.
    > 
    > TC members therefore have the choice to either watch the items in JIRA,
    > or to just review the changes in the next draft. The approval of a
    > resolution takes place with the approval of a committee draft. This
    > means that nothing that we do in JIRA implies any kind of approval by
    > the TC, and that it is not required to watch the changes in JIRA to
    > figure out what changes are made in a draft.
    > 
    > When a draft has been approved as committee draft, all issues applied to
    > that draft are closed (unless someone has objected to a particular
    > resolution).
    > 
    > I have created two new filters:
    > 
    > "Open 1.2 Editorial Notes" lists those items whose title starts with
    > "Editorial Notes" and that are open. This filter may be used to find all
    > issues for which no resolution does exist yet.
    > 
    > "Resolved, unapplied 1.2 Editorial Notes" lists those items for which a
    > resolution has been proposed, and whose status is "resolved". This
    > filter is useful if you want to review proposed resolution, but also
    > useful for Patrick to find the items that may be ready to be applied to 
    > the specification.
    > 
    > Best regards
    > 
    > Michael
    > 
    > 
    > 
    > 
    > 
    > On 05/28/09 20:05, robert_weir@us.ibm.com wrote:
    > > You probably want to delete all of those 260+ notifications from JIRA. 
    
    > > These was a one-time port of Patrick's remaining editor notes. They've 
    
    > > been entered, opened, and assigned to Patrick.  This will make it 
    easier 
    > > to track these items going forward.
    > > 
    > > Regards,
    > > 
    > > -Rob
    > > 
    > > 
    > > ---------------------------------------------------------------------
    > > To unsubscribe from this mail list, you must leave the OASIS TC that
    > > generates this mail.  Follow this link to all your TCs in OASIS at:
    > > https://www.oasis-open.org/apps/org/workgroup/portal/my_workgroups.php 
    
    > > 
    > 
    > 
    > -- 
    > Michael Brauer, Technical Architect Software Engineering
    > StarOffice/OpenOffice.org
    > Sun Microsystems GmbH             Nagelsweg 55
    > D-20097 Hamburg, Germany          michael.brauer@sun.com
    > http://sun.com/staroffice         +49 40 23646 500
    > http://blogs.sun.com/GullFOSS
    > 
    > Sitz der Gesellschaft: Sun Microsystems GmbH, Sonnenallee 1,
    >       D-85551 Kirchheim-Heimstetten
    > Amtsgericht Muenchen: HRB 161028
    > Geschaeftsfuehrer: Thomas Schroeder, Wolfgang Engels, Wolf Frenkel
    > Vorsitzender des Aufsichtsrates: Martin Haering
    > 
    > 
    > 
    > ---------------------------------------------------------------------
    > To unsubscribe from this mail list, you must leave the OASIS TC that
    > generates this mail.  Follow this link to all your TCs in OASIS at:
    > https://www.oasis-open.org/apps/org/workgroup/portal/my_workgroups.php 
    > 
    
    


  • 3.  Re: [office] JIRA Work Flow Proposal, was Re: [office] All done

    Posted 05-29-2009 14:10
    Rob,
    
    robert_weir@us.ibm.com wrote:
    > This sounds good.  I'd suggest two other possibilities:
    >
    > 1) We probably need a way to suggest that a particular item requires 
    > discussion by the TC, because it is a large change or controversial.  JIRA 
    > doesn't have  a workflow state that corresponds to this.  So, I think we 
    > need to rely on TC members (including Patrick) to nominate items for TC 
    > meeting agendas, that they think require additional discussion.  Maybe 
    > they also add a comment to the JIRA issue, something we can search for 
    > like "Hold for Discussion".  This would indicate that we do not trigger 
    > the "Apply" state change until discussed.  Of course, the vast majority of 
    > issues are editorial or minor and will require no in depth discussion, and 
    > would make it into the proposed CD for review and approval at that time.
    >
    >   
    Yes, but with the caveat that even issues that need discussion may not 
    need to wait for time on a TC call. To the extent possible (it isn't 
    always) I would like to see the TC list used for discussion and 
    resolution of issues.
    > 2) It is possible that some of the editor notes are found to be invalid, 
    > or should be deferred for the next version of ODF.  So it is possible that 
    > some comments might not go to the create->open->resolve->apply->close 
    > states, but might go directly create->close, or create->assign to 
    > ODF-Next.  These will probably be rare.
    >
    >   
    Well, not just editorial notes (although that is what we are discussing) 
    but other comments as well could go into an "assign to ODF-Next" status.
    
    Hope you are looking forward to a great weekend!
    
    Patrick
    > -Rob
    >
    > Michael.Brauer@Sun.COM wrote on 05/29/2009 07:47:11 AM:
    >   
    >> [office] JIRA Work Flow Proposal, was Re: [office] All done
    >>
    >> Sent by:
    >>
    >> Michael.Brauer@Sun.COM
    >>
    >> To get an understanding what the work flow in JIRA for these issues
    >> could be now, I've started to add the comments and proposed resolution
    >> that I have forwarded as documents previously to the items. I have
    >> entered the proposed resolutions into the "proposal" field. To be able
    >> to differ between those item where we have a proposed resolution and
    >> those where we have none, I've set the status of those items where we
    >> have a proposed resolution to "Resolved". This is the 3rd status in the
    >> chain "New" -> "Open" -> "Resolved" -> "Applied" -> "Closed".
    >>
    >> My proposal how we proceed is:
    >>
    >> Whoever has time and and interest may comment on an item, and may
    >> provide a resolution. This resolution is recorded in the "proposal"
    >> field. If a proposal for a resolution does exist, the proposer of the
    >> resolution sets the status of the issue to "resolved".
    >>
    >> Patrick (or myself if an issue affects the schema) takes the issues
    >> whose status is "resolved" and applies the proposed resolution to the
    >> specification text. He then sets the status to "Applied".
    >>
    >> The changes to the specification still will be recorded. We continue to
    >> have a week for TC internal reviews of drafts before we vote on them in
    >> a TC meeting, or we conduct electronic ballots for committee drafts, 
    >> that run at least a week anyway, so that there is the same time 
    >> available for a review.
    >>
    >> TC members therefore have the choice to either watch the items in JIRA,
    >> or to just review the changes in the next draft. The approval of a
    >> resolution takes place with the approval of a committee draft. This
    >> means that nothing that we do in JIRA implies any kind of approval by
    >> the TC, and that it is not required to watch the changes in JIRA to
    >> figure out what changes are made in a draft.
    >>
    >> When a draft has been approved as committee draft, all issues applied to
    >> that draft are closed (unless someone has objected to a particular
    >> resolution).
    >>
    >> I have created two new filters:
    >>
    >> "Open 1.2 Editorial Notes" lists those items whose title starts with
    >> "Editorial Notes" and that are open. This filter may be used to find all
    >> issues for which no resolution does exist yet.
    >>
    >> "Resolved, unapplied 1.2 Editorial Notes" lists those items for which a
    >> resolution has been proposed, and whose status is "resolved". This
    >> filter is useful if you want to review proposed resolution, but also
    >> useful for Patrick to find the items that may be ready to be applied to 
    >> the specification.
    >>
    >> Best regards
    >>
    >> Michael
    >>
    >>
    >>
    >>
    >>
    >> On 05/28/09 20:05, robert_weir@us.ibm.com wrote:
    >>     
    >>> You probably want to delete all of those 260+ notifications from JIRA. 
    >>>       
    >
    >   
    >>> These was a one-time port of Patrick's remaining editor notes. They've 
    >>>       
    >
    >   
    >>> been entered, opened, and assigned to Patrick.  This will make it 
    >>>       
    > easier 
    >   
    >>> to track these items going forward.
    >>>
    >>> Regards,
    >>>
    >>> -Rob
    >>>
    >>>
    >>> ---------------------------------------------------------------------
    >>> To unsubscribe from this mail list, you must leave the OASIS TC that
    >>> generates this mail.  Follow this link to all your TCs in OASIS at:
    >>> https://www.oasis-open.org/apps/org/workgroup/portal/my_workgroups.php 
    >>>       
    >
    >   
    >> -- 
    >> Michael Brauer, Technical Architect Software Engineering
    >> StarOffice/OpenOffice.org
    >> Sun Microsystems GmbH             Nagelsweg 55
    >> D-20097 Hamburg, Germany          michael.brauer@sun.com
    >> http://sun.com/staroffice         +49 40 23646 500
    >> http://blogs.sun.com/GullFOSS
    >>
    >> Sitz der Gesellschaft: Sun Microsystems GmbH, Sonnenallee 1,
    >>       D-85551 Kirchheim-Heimstetten
    >> Amtsgericht Muenchen: HRB 161028
    >> Geschaeftsfuehrer: Thomas Schroeder, Wolfgang Engels, Wolf Frenkel
    >> Vorsitzender des Aufsichtsrates: Martin Haering
    >>
    >>
    >>
    >> ---------------------------------------------------------------------
    >> To unsubscribe from this mail list, you must leave the OASIS TC that
    >> generates this mail.  Follow this link to all your TCs in OASIS at:
    >> https://www.oasis-open.org/apps/org/workgroup/portal/my_workgroups.php 
    >>
    >>     
    >
    >
    > ---------------------------------------------------------------------
    > To unsubscribe from this mail list, you must leave the OASIS TC that
    > generates this mail.  Follow this link to all your TCs in OASIS at:
    > https://www.oasis-open.org/apps/org/workgroup/portal/my_workgroups.php 
    >
    >
    >   
    
    -- 
    Patrick Durusau
    patrick@durusau.net
    Chair, V1 - US TAG to JTC 1/SC 34
    Convener, JTC 1/SC 34/WG 3 (Topic Maps)
    Editor, OpenDocument Format TC (OASIS), Project Editor ISO/IEC 26300
    Co-Editor, ISO/IEC 13250-1, 13250-5 (Topic Maps)
    
    


  • 4.  Re: [office] JIRA Work Flow Proposal, was Re: [office] All done

    Posted 05-29-2009 14:53
    Michael,
    
    The proposed flow looks good to me but I have a fairly practical question:
    
    If I mark a comment as "applied," I would expect users to think if they 
    look at the current working draft, the comment *has been* applied. That 
    is that the current working draft is in synch with the status as 
    reflected in JIRA.
    
    Would anyone object to my simply updating the status of comments in JIRA 
    and then posting a working draft later the same day? Such that any 
    comment marked "applied" will be reflected in a draft dated for the same 
    day?
    
    Granted in my working copy I may be updating comments, particularly 
    those that apply to several areas over a period of days but I will only 
    update the status in JIRA on one day and post that draft later the same day.
    
    Does anyone have a better suggestion?
    
    Hope everyone is either enjoying now or looking forward to a great weekend!
    
    Patrick
    
    
    Michael Brauer - Sun Germany - ham02 - Hamburg wrote:
    > To get an understanding what the work flow in JIRA for these issues
    > could be now, I've started to add the comments and proposed resolution
    > that I have forwarded as documents previously to the items. I have
    > entered the proposed resolutions into the "proposal" field. To be able
    > to differ between those item where we have a proposed resolution and
    > those where we have none, I've set the status of those items where we
    > have a proposed resolution to "Resolved". This is the 3rd status in the
    > chain "New" -> "Open" -> "Resolved" -> "Applied" -> "Closed".
    >
    > My proposal how we proceed is:
    >
    > Whoever has time and and interest may comment on an item, and may
    > provide a resolution. This resolution is recorded in the "proposal"
    > field. If a proposal for a resolution does exist, the proposer of the
    > resolution sets the status of the issue to "resolved".
    >
    > Patrick (or myself if an issue affects the schema) takes the issues
    > whose status is "resolved" and applies the proposed resolution to the
    > specification text. He then sets the status to "Applied".
    >
    > The changes to the specification still will be recorded. We continue to
    > have a week for TC internal reviews of drafts before we vote on them in
    > a TC meeting, or we conduct electronic ballots for committee drafts, 
    > that run at least a week anyway, so that there is the same time 
    > available for a review.
    >
    > TC members therefore have the choice to either watch the items in JIRA,
    > or to just review the changes in the next draft. The approval of a
    > resolution takes place with the approval of a committee draft. This
    > means that nothing that we do in JIRA implies any kind of approval by
    > the TC, and that it is not required to watch the changes in JIRA to
    > figure out what changes are made in a draft.
    >
    > When a draft has been approved as committee draft, all issues applied to
    > that draft are closed (unless someone has objected to a particular
    > resolution).
    >
    > I have created two new filters:
    >
    > "Open 1.2 Editorial Notes" lists those items whose title starts with
    > "Editorial Notes" and that are open. This filter may be used to find all
    > issues for which no resolution does exist yet.
    >
    > "Resolved, unapplied 1.2 Editorial Notes" lists those items for which a
    > resolution has been proposed, and whose status is "resolved". This
    > filter is useful if you want to review proposed resolution, but also
    > useful for Patrick to find the items that may be ready to be applied 
    > to the specification.
    >
    > Best regards
    >
    > Michael
    >
    >
    >
    >
    >
    > On 05/28/09 20:05, robert_weir@us.ibm.com wrote:
    >> You probably want to delete all of those 260+ notifications from 
    >> JIRA. These was a one-time port of Patrick's remaining editor notes. 
    >> They've been entered, opened, and assigned to Patrick.  This will 
    >> make it easier to track these items going forward.
    >>
    >> Regards,
    >>
    >> -Rob
    >>
    >>
    >> ---------------------------------------------------------------------
    >> To unsubscribe from this mail list, you must leave the OASIS TC that
    >> generates this mail.  Follow this link to all your TCs in OASIS at:
    >> https://www.oasis-open.org/apps/org/workgroup/portal/my_workgroups.php
    >
    >
    
    -- 
    Patrick Durusau
    patrick@durusau.net
    Chair, V1 - US TAG to JTC 1/SC 34
    Convener, JTC 1/SC 34/WG 3 (Topic Maps)
    Editor, OpenDocument Format TC (OASIS), Project Editor ISO/IEC 26300
    Co-Editor, ISO/IEC 13250-1, 13250-5 (Topic Maps)
    
    


  • 5.  Re: [office] JIRA Work Flow Proposal, was Re: [office] All done

    Posted 05-29-2009 15:07
    Patrick Durusau 


  • 6.  Re: [office] JIRA Work Flow Proposal, was Re: [office] All done

    Posted 06-22-2009 11:34
    On Friday 29 May 2009, robert_weir@us.ibm.com wrote:
    > I'm thinking 'applied' means you or Michael has updated the text or schema 
    > and it will appear in the next uploaded version of the text.  When the CD 
    > is approved we can then mark the issue 'closed'. 
    
    Yes. This is just like with software bugs. We mark bugs as "FIXED"
    once the fix exists in the developer's version of the source code,
    even if the fix has not been deployed to users yet. This is the same here.
    
    
    -- 
    David Faure, faure@kde.org, sponsored by Qt Software @ Nokia to work on KDE,
    Konqueror (http://www.konqueror.org), and KOffice (http://www.koffice.org).
    


  • 7.  Re: [office] JIRA Work Flow Proposal, was Re: [office] All done

    Posted 05-29-2009 15:09
    Hi all,
    
       If you need additional workflow steps just let me know - I can  
    create a customized version for the ODF TC.
    
    Mary
    
    On May 29, 2009, at 10:50 AM, Patrick Durusau wrote:
    
    > Michael,
    >
    > The proposed flow looks good to me but I have a fairly practical  
    > question:
    >
    > If I mark a comment as "applied," I would expect users to think if  
    > they look at the current working draft, the comment *has been*  
    > applied. That is that the current working draft is in synch with the  
    > status as reflected in JIRA.
    >
    > Would anyone object to my simply updating the status of comments in  
    > JIRA and then posting a working draft later the same day? Such that  
    > any comment marked "applied" will be reflected in a draft dated for  
    > the same day?
    >
    > Granted in my working copy I may be updating comments, particularly  
    > those that apply to several areas over a period of days but I will  
    > only update the status in JIRA on one day and post that draft later  
    > the same day.
    >
    > Does anyone have a better suggestion?
    >
    > Hope everyone is either enjoying now or looking forward to a great  
    > weekend!
    >
    > Patrick
    >
    >
    > Michael Brauer - Sun Germany - ham02 - Hamburg wrote:
    >> To get an understanding what the work flow in JIRA for these issues
    >> could be now, I've started to add the comments and proposed  
    >> resolution
    >> that I have forwarded as documents previously to the items. I have
    >> entered the proposed resolutions into the "proposal" field. To be  
    >> able
    >> to differ between those item where we have a proposed resolution and
    >> those where we have none, I've set the status of those items where we
    >> have a proposed resolution to "Resolved". This is the 3rd status in  
    >> the
    >> chain "New" -> "Open" -> "Resolved" -> "Applied" -> "Closed".
    >>
    >> My proposal how we proceed is:
    >>
    >> Whoever has time and and interest may comment on an item, and may
    >> provide a resolution. This resolution is recorded in the "proposal"
    >> field. If a proposal for a resolution does exist, the proposer of the
    >> resolution sets the status of the issue to "resolved".
    >>
    >> Patrick (or myself if an issue affects the schema) takes the issues
    >> whose status is "resolved" and applies the proposed resolution to the
    >> specification text. He then sets the status to "Applied".
    >>
    >> The changes to the specification still will be recorded. We  
    >> continue to
    >> have a week for TC internal reviews of drafts before we vote on  
    >> them in
    >> a TC meeting, or we conduct electronic ballots for committee  
    >> drafts, that run at least a week anyway, so that there is the same  
    >> time available for a review.
    >>
    >> TC members therefore have the choice to either watch the items in  
    >> JIRA,
    >> or to just review the changes in the next draft. The approval of a
    >> resolution takes place with the approval of a committee draft. This
    >> means that nothing that we do in JIRA implies any kind of approval by
    >> the TC, and that it is not required to watch the changes in JIRA to
    >> figure out what changes are made in a draft.
    >>
    >> When a draft has been approved as committee draft, all issues  
    >> applied to
    >> that draft are closed (unless someone has objected to a particular
    >> resolution).
    >>
    >> I have created two new filters:
    >>
    >> "Open 1.2 Editorial Notes" lists those items whose title starts with
    >> "Editorial Notes" and that are open. This filter may be used to  
    >> find all
    >> issues for which no resolution does exist yet.
    >>
    >> "Resolved, unapplied 1.2 Editorial Notes" lists those items for  
    >> which a
    >> resolution has been proposed, and whose status is "resolved". This
    >> filter is useful if you want to review proposed resolution, but also
    >> useful for Patrick to find the items that may be ready to be  
    >> applied to the specification.
    >>
    >> Best regards
    >>
    >> Michael
    >>
    >>
    >>
    >>
    >>
    >> On 05/28/09 20:05, robert_weir@us.ibm.com wrote:
    >>> You probably want to delete all of those 260+ notifications from  
    >>> JIRA. These was a one-time port of Patrick's remaining editor  
    >>> notes. They've been entered, opened, and assigned to Patrick.   
    >>> This will make it easier to track these items going forward.
    >>>
    >>> Regards,
    >>>
    >>> -Rob
    >>>
    >>>
    >>> ---------------------------------------------------------------------
    >>> To unsubscribe from this mail list, you must leave the OASIS TC that
    >>> generates this mail.  Follow this link to all your TCs in OASIS at:
    >>> https://www.oasis-open.org/apps/org/workgroup/portal/my_workgroups.php
    >>
    >>
    >
    > -- 
    > Patrick Durusau
    > patrick@durusau.net
    > Chair, V1 - US TAG to JTC 1/SC 34
    > Convener, JTC 1/SC 34/WG 3 (Topic Maps)
    > Editor, OpenDocument Format TC (OASIS), Project Editor ISO/IEC 26300
    > Co-Editor, ISO/IEC 13250-1, 13250-5 (Topic Maps)
    >
    >
    > ---------------------------------------------------------------------
    > To unsubscribe from this mail list, you must leave the OASIS TC that
    > generates this mail.  Follow this link to all your TCs in OASIS at:
    > https://www.oasis-open.org/apps/org/workgroup/portal/my_workgroups.php
    
    


  • 8.  Re: [office] JIRA Work Flow Proposal, was Re: [office] All done

    Posted 05-29-2009 15:46
    On Fri, 2009-05-29 at 11:08 -0400, Mary McRae wrote:
    > Hi all,
    > 
    >    If you need additional workflow steps just let me know - I can  
    > create a customized version for the ODF TC.
    > 
    
    I think it would be good if we wouldn't use "Resolved" just because one
    person posted a suggested solution. I think there should be a chance for
    competing solutions.
    
    So a proposal might need to sit for 48 hours before it becomes
    applicable.
    > 
    -- 
    Andreas J. Guelzow, PhD, FTICA
    Coordinator, Mathematical & Computing Sciences
    Concordia University College of Alberta
    
    


  • 9.  Re: [office] JIRA Work Flow Proposal, was Re: [office] All done

    Posted 06-02-2009 10:08
    Andreas,
    
    On 05/29/09 17:45, Andreas J. Guelzow wrote:
    > On Fri, 2009-05-29 at 11:08 -0400, Mary McRae wrote:
    >> Hi all,
    >>
    >>    If you need additional workflow steps just let me know - I can  
    >> create a customized version for the ODF TC.
    >>
    > 
    > I think it would be good if we wouldn't use "Resolved" just because one
    > person posted a suggested solution. I think there should be a chance for
    > competing solutions.
    > 
    > So a proposal might need to sit for 48 hours before it becomes
    > applicable.
    
    The approval of any resolution takes place with the approval of a draft 
    as committee draft (or with the approval of a Committee Specification, 
    because there may be multiple committee drafts, and a resolution my be 
    revised). For that reason, it is possible to propose a competing 
    solution even when an item has been applied. Sure, this may mean some 
    more work for the TC editor. But I don't expect that this situation will 
    happen frequently. And if it happens, I'm also not sure if a TC member 
    that wishes to make a counter proposal really notices a proposal in 
    question early enough to create a counter proposal within 48 hours.
    
    On the other hand, tracking when proposals have been added to an JIRA 
    item, and when the 48 hours have been passed is some overhead, and makes 
    the process more complex. But the intention behind using JIRA is to 
    simplify tracking of items and to make the tracking more transparent. 
    The intention is not to create a JIRA based resolution approval process. 
      In so far, I would recommend that we use JIRA with as little 
    additional process details as possible unless we really find that these 
    are required while using JIRA in practice.
    
    Best regards
    
    Michael
    
    -- 
    Michael Brauer, Technical Architect Software Engineering
    StarOffice/OpenOffice.org
    Sun Microsystems GmbH             Nagelsweg 55
    D-20097 Hamburg, Germany          michael.brauer@sun.com
    http://sun.com/staroffice         +49 40 23646 500
    http://blogs.sun.com/GullFOSS
    
    Sitz der Gesellschaft: Sun Microsystems GmbH, Sonnenallee 1,
    	   D-85551 Kirchheim-Heimstetten
    Amtsgericht Muenchen: HRB 161028
    Geschaeftsfuehrer: Thomas Schroeder, Wolfgang Engels, Wolf Frenkel
    Vorsitzender des Aufsichtsrates: Martin Haering
    


  • 10.  Re: [office] JIRA Work Flow Proposal, was Re: [office] All done

    Posted 05-29-2009 15:57
    Ohh... now you're asking for trouble.
    
    -Rob
    
    
    Mary McRae