OASIS Energy Interoperation TC

 View Only
  • 1.  Night is late, but under 50 Jira comments left

    Posted 11-22-2010 03:59

    Many of you have been assigned Issues. This means that while we acknowledged the unique brilliance of your comment, we were unclear as to what we might do to make the document better based on it.

    Please give us additional guidance ASAP., for inclusion in the Draft in the morning.

    tc


    “It is difficult to get a man to understand something, when his salary depends upon his not understanding it” -- Upton Sinclair.


    Toby Considine
    TC9, Inc

    OASIS Technical Advisory Board
    TC Chair: oBIX & WS-Calendar

    TC Editor: EMIX, EnergyInterop

    U.S. National Inst. of Standards and Tech. Smart Grid Architecture Committee

      

    Email: Toby.Considine@gmail.com
    Phone: (919)619-2104

    http://www.tcnine.com/
    blog: www.NewDaedalus.com



  • 2.  Re: [energyinterop] Night is late, but under 50 Jira comments left

    Posted 11-22-2010 05:05
    Toby, et al,

    Considering that we've many comments from few members of the TC and many of them need to be still resolved, which I feel is necessary for the document reflects quality and completeness for public review. I suggest a open call to TC (mon/tue) prior to Wed meeting to resolve this.

    Thanks,
    -Rish

    On Sun, Nov 21, 2010 at 7:58 PM, Toby Considine <Toby.Considine@gmail.com> wrote:

    Many of you have been assigned Issues. This means that while we acknowledged the unique brilliance of your comment, we were unclear as to what we might do to make the document better based on it.

     

    Please give us additional guidance ASAP., for inclusion in the Draft in the morning.

     

    tc

     


    “It is difficult to get a man to understand something, when his salary depends upon his not understanding it” -- Upton Sinclair.


    Toby Considine
    TC9, Inc

    OASIS Technical Advisory Board
    TC Chair: oBIX & WS-Calendar

    TC Editor: EMIX, EnergyInterop

    U.S. National Inst. of Standards and Tech. Smart Grid Architecture Committee

      

    Email: Toby.Considine@gmail.com
    Phone: (919)619-2104

    http://www.tcnine.com/
    blog: www.NewDaedalus.com

     

     




    --
    Rish Ghatikar
    Lawrence Berkeley National Laboratory
    1 Cyclotron Road, MS: 90-3111, Berkeley, CA 94720
    GGhatikar@lbl.gov | +1 510.486.6768 | +1 510.486.4089 [fax]

    This email is intended for the addressee only and may contain confidential information and should not be copied without permission. If you are not the intended recipient, please contact the sender as soon as possible and delete the email from computer[s].


  • 3.  Re: [energyinterop] Night is late, but under 50 Jira comments left

    Posted 11-22-2010 16:25
    To contunue the discussion go to the Jira project browser and look for issues assigned to you.

    When you've followed up assign back to the default (which is me).

    Thanks - great issues and discussions!

    Bill

    Sent via BlackBerry by AT&T


    From: "Toby Considine" <Toby.Considine@gmail.com>
    Sender: Toby Considine <tobyconsidine@gmail.com>
    Date: Sun, 21 Nov 2010 22:58:46 -0500
    Subject: [energyinterop] Night is late, but under 50 Jira comments left

    Many of you have been assigned Issues. This means that while we acknowledged the unique brilliance of your comment, we were unclear as to what we might do to make the document better based on it.

    Please give us additional guidance ASAP., for inclusion in the Draft in the morning.

    tc


    “It is difficult to get a man to understand something, when his salary depends upon his not understanding it” -- Upton Sinclair.


    Toby Considine
    TC9, Inc

    OASIS Technical Advisory Board
    TC Chair: oBIX & WS-Calendar

    TC Editor: EMIX, EnergyInterop

    U.S. National Inst. of Standards and Tech. Smart Grid Architecture Committee

      

    Email: Toby.Considine@gmail.com
    Phone: (919)619-2104

    http://www.tcnine.com/
    blog: www.NewDaedalus.com