OASIS Energy Interoperation TC

 View Only
Expand all | Collapse all

Not To Exceed

  • 1.  Not To Exceed

    Posted 03-11-2010 16:43

    DR – and Verification, and Verification is the conundrum. Verification is the problem because DR are is a promise to reduce load by a certain amount from an uncertain beginning end point to an unknown end point.

    What about an agreement that “I will use no more than xxx” as a DR offering. It becomes entirely results oriented (good for a service). It would be more valuable if it warranted “no spikes” rather than merely total use for a [15 minute] period. It certainly would be callable.

    Do we adopt this? If so,  does it look like

    [emix – this is for max use]

    Or does it look like

    [Eitc: I will commit not to exceed

        [emix]

    ]

    In other words, is max an EITC or EMIX thing…

    tc


    "Energy and persistence conquer all things." -- Benjamin Franklin


    Toby Considine
    TC9, Inc

    OASIS Technical Advisory Board
    TC Chair: oBIX & WS-Calendar

    TC Editor: EMIX, EnergyInterop

      

    Email: Toby.Considine@gmail.com

    Phone: (919)619-2104

    http://www.tcnine.com/

    blog: www.NewDaedalus.com



  • 2.  RE: [energyinterop] Not To Exceed

    Posted 03-11-2010 18:22