  • 1.  EMIX Package for release or not

    Posted 06-22-2011 11:13
    It appears from last night’s Jira activities that some small changes in section on approach (Section 2) would remove some annoyances that some members of the IRC find in EMIX. My personal preference is to give the TC completed everything at least 48 hours before an anticipated vote, but there is no procedural requirement that we do so.   If the TC is wi8lling, I could make a section 34 with these changes * and no others * to upload before noon today   tc   "If something is not worth doing, it`s not worth doing well" Peter Drucker Toby Considine Chair, OASIS oBIX Technical Committee U.S. National Inst. of Standards and Tech. Smart Grid Architecture Committee Facilities Technology Office University of North Carolina Chapel Hill, NC    Email: Toby.Considine@ unc.edu Phone: (919)962-9073 http://www.oasis-open.org blog: www.NewDaedalus.com    


  • 2.  RE: [emix] EMIX Package for release or not

    Posted 06-22-2011 12:50
    Makes good sense to me to make these wording changes in Section 2.   Edward G. Cazalet, Ph.D. 101 First Street, Suite 552 Los Altos, CA 94022 650-949-5274 cell: 408-621-2772 ed@cazalet.com www.cazalet.com   From: Considine, Toby (Campus Services IT) [mailto:Toby.Considine@unc.edu] Sent: Wednesday, June 22, 2011 4:12 AM To: emix@lists.oasis-open.org Subject: [emix] EMIX Package for release or not   It appears from last night’s Jira activities that some small changes in section on approach (Section 2) would remove some annoyances that some members of the IRC find in EMIX. My personal preference is to give the TC completed everything at least 48 hours before an anticipated vote, but there is no procedural requirement that we do so.   If the TC is wi8lling, I could make a section 34 with these changes * and no others * to upload before noon today   tc   "If something is not worth doing, it`s not worth doing well" Peter Drucker Toby Considine Chair, OASIS oBIX Technical Committee U.S. National Inst. of Standards and Tech. Smart Grid Architecture Committee Facilities Technology Office University of North Carolina Chapel Hill, NC    Email: Toby.Considine@ unc.edu Phone: (919)962-9073 http://www.oasis-open.org blog: www.NewDaedalus.com    


  • 3.  Re: [emix] EMIX Package for release or not

    Posted 06-22-2011 12:56
    I agree with Ed -- the changes address significant issues; further discussion can be addressed in the Note on Using Emix post 1.0. Thanks! bill -- William Cox Email: wtcox@CoxSoftwareArchitects.com Web: http://www.CoxSoftwareArchitects.com +1 862 485 3696 mobile +1 908 277 3460 fax On 6/22/11 8:50 AM, Ed Cazalet wrote: 007601cc30da$ef7a1160$ce6e3420$@cazalet.com type= cite > X-NONE X-NONE MicrosoftInternetExplorer4 Makes good sense to me to make these wording changes in Section 2.   Edward G. Cazalet, Ph.D. 101 First Street, Suite 552 Los Altos, CA 94022 650-949-5274 cell: 408-621-2772 ed@cazalet.com www.cazalet.com   From: Considine, Toby (Campus Services IT) [ mailto:Toby.Considine@unc.edu ] Sent: Wednesday, June 22, 2011 4:12 AM To: emix@lists.oasis-open.org Subject: [emix] EMIX Package for release or not   It appears from last night’s Jira activities that some small changes in section on approach (Section 2) would remove some annoyances that some members of the IRC find in EMIX. My personal preference is to give the TC completed everything at least 48 hours before an anticipated vote, but there is no procedural requirement that we do so.   If the TC is wi8lling, I could make a section 34 with these changes * and no others * to upload before noon today   tc   If something is not worth doing, it`s not worth doing well Peter Drucker Toby Considine Chair, OASIS oBIX Technical Committee U.S. National Inst. of Standards and Tech. Smart Grid Architecture Committee Facilities Technology Office University of North Carolina Chapel Hill, NC    Email: Toby.Considine@ unc.edu Phone: (919)962-9073 http://www.oasis-open.org blog: www.NewDaedalus.com    


  • 4.  Re: [emix] EMIX Package for release or not

    Posted 06-22-2011 16:27
    I'm still concerned about the ws-calendar dependency mentioned in http://lists.oasis-open.org/archives/emix/201106/msg00419.html In this last download package we again have a set of ws-calendar schema including two additional embedded zips called wscalendar-wd26-actual.zip and wscalendar-wd26-gamed.zip. Aside from these two new zips, I think it's important to understand the dependency, how we are handling it, and its implications for the sustainability of EMIX. Thanks, Anne Considine, Toby (Campus Services IT) wrote, On 6/22/2011 4:12 AM: 49388A5276025649AC24AF97ADB9DA62839DBE5689@facmailmb3.facilities.unc.edu type= cite > It appears from last night’s Jira activities that some small changes in section on approach (Section 2) would remove some annoyances that some members of the IRC find in EMIX. My personal preference is to give the TC completed everything at least 48 hours before an anticipated vote, but there is no procedural requirement that we do so.   If the TC is wi8lling, I could make a section 34 with these changes * and no others * to upload before noon today   tc   If something is not worth doing, it`s not worth doing well Peter Drucker Toby Considine Chair, OASIS oBIX Technical Committee U.S. National Inst. of Standards and Tech. Smart Grid Architecture Committee Facilities Technology Office University of North Carolina Chapel Hill, NC    Email: Toby.Considine@ unc.edu Phone: (919)962-9073 http://www.oasis-open.org blog: www.NewDaedalus.com