I have completed a complete walk-through of everything in the Informal
Review Comments. Issues I was unsure of, I re-assigned to the commenter to
to see if they think I got it.
Commenters that have been assigned back for review in Jira should make
their own comments soon.
Have at it, guys. SOmething to do on Friday.
-- Toby Considine
The document revision named WS-Calendar-1 0-spec-wd-07 (WS-Calendar-1
0-spec-wd-07.pdf) has been submitted by Toby Considine to the OASIS Web
Services Calendar (WS-Calendar) TC document repository. This document is
revision #2 of WS-Calendar-1 0-spec-wd-07 with changes.doc.
Document Description:
Response to running through all of the comments of informal review
View Document Details:
http://www.oasis-open.org/committees/document.php?document_id=38824
Download Document:
http://www.oasis-open.org/committees/download.php/38824/WS-Calendar-1%200-spec-wd-07.pdf
Revision:
This document is revision #2 of WS-Calendar-1 0-spec-wd-07 with
changes.doc. The document details page referenced above will show the
complete revision history.
PLEASE NOTE: If the above links do not work for you, your email application
may be breaking the link into two pieces. You may be able to copy and paste
the entire link address into the address field of your web browser.
-OASIS Open Administration