Disposition of this list was updated for close issues or those previously incorporated into the OASIS submission package, and added requirements uncovered from planning cycles of the May 2011 5-state draft TEP Proof of Concept exercise.
Tim -- Tim Grapes The document revision named EDXL-TEP Practitioner open issues (TEP-Stakeholder-IssuesRev2.5_Feb2011.xls) has been submitted by Tim Grapes to the EM TEP SC document repository. This document is revision #1 of TEP-Stakeholder-IssuesRev2.3_06-10-2010(1).xls. Document Description: TEP requirements and draft messageing specification review cycle comments and issues which were deferred to the OASIS process for resolution View Document Details:
http://www.oasis-open.org/committees/document.php?document_id=41756 Download Document:
http://www.oasis-open.org/committees/download.php/41756/TEP-Stakeholder-IssuesRev2.5_Feb2011.xls Revision: This document is revision #1 of TEP-Stakeholder-IssuesRev2.3_06-10-2010(1).xls. The document details page referenced above will show the complete revision history. PLEASE NOTE: If the above links do not work for you, your email application may be breaking the link into two pieces. You may be able to copy and paste the entire link address into the address field of your web browser. -OASIS Open Administration