OASIS Universal Business Language (UBL) TC

 View Only

RE: [ubl] UBL master data for maintenance

  • 1.  RE: [ubl] UBL master data for maintenance

    Posted 02-25-2005 18:16
     MHonArc v2.5.0b2 -->
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    

    ubl message

    [Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]


    Subject: RE: [ubl] UBL master data for maintenance


    Quite frankly, I'm very surprised and confused by this thread and the one
    beginning at http://lists.oasis-open.org/archives/ubl/200502/msg00039.html.
    
    As a user of UBL 1.0, when I read the official documentation, I came away
    with the distinct impression that EDIFIX was clearly the tool of choice for
    UBL. Refer to these quotes (not in order) from
    http://docs.oasis-open.org/ubl/cd-UBL-1.0/ 
    
    "A commercial CC-aware schema generation tool, GEFEG EDIFIXR 5.0, was used
    to read the spreadsheets as UML data models, perform Q/A with them, and
    produce a schema representation adhering to the UBL 1.0 Naming and Design
    Rules, as illustrated below...."
    
    "The UBL XML Naming and Design Rules (NDR) checklist included in this
    package describes the rules used to determine UBL 1.0 XSD schema structures
    and element/attribute names...."
    
    "The UBL XSD schemas are implementations of the document assembly models
    defined by UBL. They are the only normative representation of the UBL 1.0
    document types and library components...."
    
    "These advantages [of spreadsheets] were felt to outweigh the main
    disadvantage of spreadsheet notation, which is the lack of referential
    integrity controls in the modeling language itself; manual editing is
    required to control the impact of changes. In this case, fortunately, the
    commercial tool used to generate the final schemas from the spreadsheets was
    also capable of verifying model integrity.
    
    "The UBL ASN.1 specification defines the same UBL documents as the UBL XSD
    schemas in Section 6 that constitute the normative definitions of valid UBL
    documents...."
    
    I took this to mean that the *only* normative version of the model was XML
    Schema, rather than the spreadsheets. Since the schemas were produced by
    EDIFIX, then EDIFIX was something I'd better consider getting.
    
    I cannot find a reference that says the spreadsheets are normative and it's
    my understanding that the EDIFIX Q/A process actually uncovered numerous
    bugs in the spreadsheets. (I have seen this first hand with my own
    spreadsheets and EDIFIX.)
    
    Mark C,
    
    Is is true as you indicated in your Nov. 2004 CCTS/NDR training class that
    LMI is working on its own CCTS/NDR software? What is the name of that
    software and when will it be demonstrated to the UBL TC? How does it (or
    will it) handle the versioning issue mentioned in the other thread?
    
    -Ken Sall
    
    
    -----Original Message-----
    From: Grimley Michael J NPRI [mailto:GrimleyMJ@Npt.NUWC.Navy.Mil] 
    Sent: Friday, February 25, 2005 12:50 PM
    To: ubl@lists.oasis-open.org
    Subject: RE: [ubl] UBL master data for maintenance
    
    
    I would also like to remind members of one of the UBL Guiding Principles:
    
        "Tool Use and Support - The design of UBL will not make any assumptions
    about sophisticated tools for creation, management, storage, or presentation
    being available. The lowest common denominator for tools is incredibly low
    (for example, Notepad) and the variety of tools used is staggering. We do
    not see this situation changing in the near term."
    
    Thank You,
    MikeG
    
    -----Original Message-----
    From: jon.bosak@sun.com [mailto:jon.bosak@sun.com] 
    Sent: Friday, 25 February 2005 12 20
    To: ubl@lists.oasis-open.org
    Subject: Re: [ubl] UBL master data for maintenance
    
    [dill2@gefeg.com:]
    
    |   After reading the UBL call minutes, I understand that the current 
    | decision is to view spreadsheets as the maintenance master data of 
    | UBL. This means necessarily that UBL plans to produce further errors 
    | in the future too. I would like to ask for which reasons the earlier 
    | decision to use Edifix as the master has been overturned?
    
    There was never a decision to use EF as the master.  On the contrary, the
    decision was explicitly to use the spreadsheets as the master, and it was
    upon the basis of this understanding, and the agreement by GEFEG to provide
    for both import and export of the spreadsheets, that the TC agreed to use EF
    for the UBL 1.1 build cycle.
    
    Jon
    
    
    To unsubscribe from this mailing list (and be removed from the roster of the
    OASIS TC), go to
    http://www.oasis-open.org/apps/org/workgroup/ubl/members/leave_workgroup.php
    .
    
    To unsubscribe from this mailing list (and be removed from the roster of the
    OASIS TC), go to
    http://www.oasis-open.org/apps/org/workgroup/ubl/members/leave_workgroup.php
    .
    
    
    
    


    [Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]