FW: Veronique and Grant contract

  • 1.  FW: Veronique and Grant contract

    Posted 12-22-2015 13:07
    Scott, Dee, Cathie: Please see below. The Steering Committee included this in our budget planning for this year (approved March 25) and we noted that the documentation was coming along well in our status update on July 15). On September 29, during the financial status part of the meeting, we checked on when to expect invoices. Monica indicated that the LegalDocML TC was waiting for the final version of the documentation before approving the two invoices for Grant and Veronique. Apparently we missed the step to approve their contracts. Can we approve via email so that the contracts may be retroactive for the work that was done? Please advise. Thanks, Laurel

    Attachment(s)

    doc
    contractVeronique2015.doc   29 KB 1 version
    doc
    contractGrant2015.doc   35 KB 1 version


  • 2.  Re: FW: Veronique and Grant contract

    Posted 12-22-2015 17:02
    Hi Laurel, ?I am slightly confused.  Do you have the contracts signed by Grant & Veronique that need to be countersigned by Laurent?  Or do I need to prepare another contract with information from the StC for a description of services to be performed?   The last contracts I have on file are from 2014.  Thanks Cathie ? ? On Tue, Dec 22, 2015 at 8:06 AM, Shifrin, Laurel (LNG-HBE) < Laurel.Shifrin@lexisnexis.com > wrote: Scott, Dee, Cathie: Please see below. The Steering Committee included this in our budget planning for this year (approved March 25) and we noted that the documentation was coming along well in our status update on July 15). On September 29, during the financial status part of the meeting, we checked on when to expect invoices. Monica indicated that the LegalDocML TC was waiting for the final version of the documentation before approving the two invoices for Grant and Veronique. Apparently we missed the step to approve their contracts. Can we approve via email so that the contracts may be retroactive for the work that was done? Please advise. Thanks, Laurel


  • 3.  Re: FW: Veronique and Grant contract

    Posted 12-22-2015 17:12
    Dear Cathie, the contracts refer to year 2015. The budget was approved in the beginning of the year. I managed the Tara's contract, but I missed to send to you the Grant and Veronique ones, or better I supposed to have done, but I didn't. Sorry I mortified. Yours, Monica Il 22/12/2015 18:01, Cathie Mayo ha scritto: Hi Laurel, ? I am slightly confused.  Do you have the contracts signed by Grant & Veronique that need to be countersigned by Laurent?  Or do I need to prepare another contract with information from the StC for a description of services to be performed?   The last contracts I have on file are from 2014.  Thanks Cathie ? ? On Tue, Dec 22, 2015 at 8:06 AM, Shifrin, Laurel (LNG-HBE) < Laurel.Shifrin@lexisnexis.com > wrote: Scott, Dee, Cathie: Please see below. The Steering Committee included this in our budget planning for this year (approved March 25) and we noted that the documentation was coming along well in our status update on July 15). On September 29, during the financial status part of the meeting, we checked on when to expect invoices. Monica indicated that the LegalDocML TC was waiting for the final version of the documentation before approving the two invoices for Grant and Veronique. Apparently we missed the step to approve their contracts. Can we approve via email so that the contracts may be retroactive for the work that was done? Please advise. Thanks, Laurel


  • 4.  RE: FW: Veronique and Grant contract

    Posted 12-22-2015 17:23




    Hi Cathie –the documents I forwarded from Monica are the ones that would need to be countersigned, for work done in 2015. Since we’re nearly out of 2015, we’re
    not sure about the legality/appropriateness of this. Grant and Veronique did the work, per the contracts but now that we’re ready to approve the invoices, it seems we missed the crucial step of getting the contracts signed.

     
    Thanks, Laurel
     


    From: monica.palmirani [mailto:monica.palmirani@unibo.it]

    Sent: Tuesday, December 22, 2015 12:12 PM
    To: Cathie Mayo; Shifrin, Laurel (LNG-HBE)
    Cc: Scott McGrath; Dee Schur (dee.schur@oasis-open.org); legalxml-sc@lists.oasis-open.org
    Subject: Re: FW: Veronique and Grant contract


     

    Dear Cathie,

    the contracts refer to year 2015.
    The budget was approved in the beginning of the year.
    I managed the Tara's contract, but I missed to send to you the Grant and Veronique ones, or better I supposed to have done, but I didn't.
    Sorry I mortified.

    Yours,
    Monica


    Il 22/12/2015 18:01, Cathie Mayo ha scritto:




    Hi Laurel,



    ? I am slightly confused.  Do you have the contracts signed by Grant & Veronique that need to



    be countersigned by Laurent?  Or do I need to prepare another contract with information from



    the StC for a description of services to be performed?   The last contracts I have on file are



    from 2014. 



    Thanks


    Cathie ?

    ?


     

    On Tue, Dec 22, 2015 at 8:06 AM, Shifrin, Laurel (LNG-HBE) < Laurel.Shifrin@lexisnexis.com > wrote:
    Scott, Dee, Cathie:

    Please see below. The Steering Committee included this in our budget planning for this year (approved March 25) and we noted that the documentation was coming along well in our status update on July 15). On September 29, during the financial status part of
    the meeting, we checked on when to expect invoices. Monica indicated that the LegalDocML TC was waiting for the final version of the documentation before approving the two invoices for Grant and Veronique. Apparently we missed the step to approve their contracts.
    Can we approve via email so that the contracts may be retroactive for the work that was done? Please advise.

    Thanks, Laurel




  • 5.  Re: FW: Veronique and Grant contract

    Posted 12-22-2015 18:28
    Hi Laurel, Sorry I assumed they were the invoices but now see they are the Deliverables. I suggest we add them as an additional set of Deliverables under the the existing contract from 2014, following the same terms and conditions. The StC can approve the new set of deliverables via email and I will add the new Schedule A's to their existing contracts.  Thanks Cathie On Tue, Dec 22, 2015 at 12:22 PM, Shifrin, Laurel (LNG-HBE) < Laurel.Shifrin@lexisnexis.com > wrote: Hi Cathie –the documents I forwarded from Monica are the ones that would need to be countersigned, for work done in 2015. Since we’re nearly out of 2015, we’re not sure about the legality/appropriateness of this. Grant and Veronique did the work, per the contracts but now that we’re ready to approve the invoices, it seems we missed the crucial step of getting the contracts signed.   Thanks, Laurel   From: monica.palmirani [mailto: monica.palmirani@unibo.it ] Sent: Tuesday, December 22, 2015 12:12 PM To: Cathie Mayo; Shifrin, Laurel (LNG-HBE) Cc: Scott McGrath; Dee Schur ( dee.schur@oasis-open.org ); legalxml-sc@lists.oasis-open.org Subject: Re: FW: Veronique and Grant contract   Dear Cathie, the contracts refer to year 2015. The budget was approved in the beginning of the year. I managed the Tara's contract, but I missed to send to you the Grant and Veronique ones, or better I supposed to have done, but I didn't. Sorry I mortified. Yours, Monica Il 22/12/2015 18:01, Cathie Mayo ha scritto: Hi Laurel, ? I am slightly confused.  Do you have the contracts signed by Grant & Veronique that need to be countersigned by Laurent?  Or do I need to prepare another contract with information from the StC for a description of services to be performed?   The last contracts I have on file are from 2014.  Thanks Cathie ? ?   On Tue, Dec 22, 2015 at 8:06 AM, Shifrin, Laurel (LNG-HBE) < Laurel.Shifrin@lexisnexis.com > wrote: Scott, Dee, Cathie: Please see below. The Steering Committee included this in our budget planning for this year (approved March 25) and we noted that the documentation was coming along well in our status update on July 15). On September 29, during the financial status part of the meeting, we checked on when to expect invoices. Monica indicated that the LegalDocML TC was waiting for the final version of the documentation before approving the two invoices for Grant and Veronique. Apparently we missed the step to approve their contracts. Can we approve via email so that the contracts may be retroactive for the work that was done? Please advise. Thanks, Laurel


  • 6.  Re: FW: Veronique and Grant contract

    Posted 12-22-2015 18:34
    Hi Cathie, for better understand the issue see the Veronique and Grant invoices of 2015 in attachment that we intend to approve within this year in order to pay them. Yours, Monica Il 22/12/2015 19:27, Cathie Mayo ha scritto: Hi Laurel, Sorry I assumed they were the invoices but now see they are the Deliverables. I suggest we add them as an additional set of Deliverables under the the existing contract from 2014, following the same terms and conditions. The StC can approve the new set of deliverables via email and I will add the new Schedule A's to their existing contracts.  Thanks Cathie On Tue, Dec 22, 2015 at 12:22 PM, Shifrin, Laurel (LNG-HBE) < Laurel.Shifrin@lexisnexis.com > wrote: Hi Cathie –the documents I forwarded from Monica are the ones that would need to be countersigned, for work done in 2015. Since we’re nearly out of 2015, we’re not sure about the legality/appropriateness of this. Grant and Veronique did the work, per the contracts but now that we’re ready to approve the invoices, it seems we missed the crucial step of getting the contracts signed.   Thanks, Laurel   From: monica.palmirani [mailto: monica.palmirani@unibo.it ] Sent: Tuesday, December 22, 2015 12:12 PM To: Cathie Mayo; Shifrin, Laurel (LNG-HBE) Cc: Scott McGrath; Dee Schur ( dee.schur@oasis-open.org ); legalxml-sc@lists.oasis-open.org Subject: Re: FW: Veronique and Grant contract   Dear Cathie, the contracts refer to year 2015. The budget was approved in the beginning of the year. I managed the Tara's contract, but I missed to send to you the Grant and Veronique ones, or better I supposed to have done, but I didn't. Sorry I mortified. Yours, Monica Il 22/12/2015 18:01, Cathie Mayo ha scritto: Hi Laurel, ? I am slightly confused.  Do you have the contracts signed by Grant & Veronique that need to be countersigned by Laurent?  Or do I need to prepare another contract with information from the StC for a description of services to be performed?   The last contracts I have on file are from 2014.  Thanks Cathie ? ?   On Tue, Dec 22, 2015 at 8:06 AM, Shifrin, Laurel (LNG-HBE) < Laurel.Shifrin@lexisnexis.com > wrote: Scott, Dee, Cathie: Please see below. The Steering Committee included this in our budget planning for this year (approved March 25) and we noted that the documentation was coming along well in our status update on July 15). On September 29, during the financial status part of the meeting, we checked on when to expect invoices. Monica indicated that the LegalDocML TC was waiting for the final version of the documentation before approving the two invoices for Grant and Veronique. Apparently we missed the step to approve their contracts. Can we approve via email so that the contracts may be retroactive for the work that was done? Please advise. Thanks, Laurel


  • 7.  Re: FW: Veronique and Grant contract

    Posted 12-22-2015 18:46
    Hi Monica, Yes, we will be able to process them this year. Thanks Cathie On Tue, Dec 22, 2015 at 1:33 PM, monica.palmirani < monica.palmirani@unibo.it > wrote: Hi Cathie, for better understand the issue see the Veronique and Grant invoices of 2015 in attachment that we intend to approve within this year in order to pay them. Yours, Monica Il 22/12/2015 19:27, Cathie Mayo ha scritto: Hi Laurel, Sorry I assumed they were the invoices but now see they are the Deliverables. I suggest we add them as an additional set of Deliverables under the the existing contract from 2014, following the same terms and conditions. The StC can approve the new set of deliverables via email and I will add the new Schedule A's to their existing contracts.  Thanks Cathie On Tue, Dec 22, 2015 at 12:22 PM, Shifrin, Laurel (LNG-HBE) < Laurel.Shifrin@lexisnexis.com > wrote: Hi Cathie –the documents I forwarded from Monica are the ones that would need to be countersigned, for work done in 2015. Since we’re nearly out of 2015, we’re not sure about the legality/appropriateness of this. Grant and Veronique did the work, per the contracts but now that we’re ready to approve the invoices, it seems we missed the crucial step of getting the contracts signed.   Thanks, Laurel   From: monica.palmirani [mailto: monica.palmirani@unibo.it ] Sent: Tuesday, December 22, 2015 12:12 PM To: Cathie Mayo; Shifrin, Laurel (LNG-HBE) Cc: Scott McGrath; Dee Schur ( dee.schur@oasis-open.org ); legalxml-sc@lists.oasis-open.org Subject: Re: FW: Veronique and Grant contract   Dear Cathie, the contracts refer to year 2015. The budget was approved in the beginning of the year. I managed the Tara's contract, but I missed to send to you the Grant and Veronique ones, or better I supposed to have done, but I didn't. Sorry I mortified. Yours, Monica Il 22/12/2015 18:01, Cathie Mayo ha scritto: Hi Laurel, ? I am slightly confused.  Do you have the contracts signed by Grant & Veronique that need to be countersigned by Laurent?  Or do I need to prepare another contract with information from the StC for a description of services to be performed?   The last contracts I have on file are from 2014.  Thanks Cathie ? ?   On Tue, Dec 22, 2015 at 8:06 AM, Shifrin, Laurel (LNG-HBE) < Laurel.Shifrin@lexisnexis.com > wrote: Scott, Dee, Cathie: Please see below. The Steering Committee included this in our budget planning for this year (approved March 25) and we noted that the documentation was coming along well in our status update on July 15). On September 29, during the financial status part of the meeting, we checked on when to expect invoices. Monica indicated that the LegalDocML TC was waiting for the final version of the documentation before approving the two invoices for Grant and Veronique. Apparently we missed the step to approve their contracts. Can we approve via email so that the contracts may be retroactive for the work that was done? Please advise. Thanks, Laurel


  • 8.  Re: FW: Veronique and Grant contract

    Posted 12-22-2015 18:57
    Thanks! Now I can sleep better. Yours, Monica Il 22/12/2015 19:45, Cathie Mayo ha scritto: Hi Monica, Yes, we will be able to process them this year. Thanks Cathie On Tue, Dec 22, 2015 at 1:33 PM, monica.palmirani < monica.palmirani@unibo.it > wrote: Hi Cathie, for better understand the issue see the Veronique and Grant invoices of 2015 in attachment that we intend to approve within this year in order to pay them. Yours, Monica Il 22/12/2015 19:27, Cathie Mayo ha scritto: Hi Laurel, Sorry I assumed they were the invoices but now see they are the Deliverables. I suggest we add them as an additional set of Deliverables under the the existing contract from 2014, following the same terms and conditions. The StC can approve the new set of deliverables via email and I will add the new Schedule A's to their existing contracts.  Thanks Cathie On Tue, Dec 22, 2015 at 12:22 PM, Shifrin, Laurel (LNG-HBE) < Laurel.Shifrin@lexisnexis.com > wrote: Hi Cathie –the documents I forwarded from Monica are the ones that would need to be countersigned, for work done in 2015. Since we’re nearly out of 2015, we’re not sure about the legality/appropriateness of this. Grant and Veronique did the work, per the contracts but now that we’re ready to approve the invoices, it seems we missed the crucial step of getting the contracts signed.   Thanks, Laurel   From: monica.palmirani [mailto: monica.palmirani@unibo.it ] Sent: Tuesday, December 22, 2015 12:12 PM To: Cathie Mayo; Shifrin, Laurel (LNG-HBE) Cc: Scott McGrath; Dee Schur ( dee.schur@oasis-open.org ); legalxml-sc@lists.oasis-open.org Subject: Re: FW: Veronique and Grant contract   Dear Cathie, the contracts refer to year 2015. The budget was approved in the beginning of the year. I managed the Tara's contract, but I missed to send to you the Grant and Veronique ones, or better I supposed to have done, but I didn't. Sorry I mortified. Yours, Monica Il 22/12/2015 18:01, Cathie Mayo ha scritto: Hi Laurel, ? I am slightly confused.  Do you have the contracts signed by Grant & Veronique that need to be countersigned by Laurent?  Or do I need to prepare another contract with information from the StC for a description of services to be performed?   The last contracts I have on file are from 2014.  Thanks Cathie ? ?   On Tue, Dec 22, 2015 at 8:06 AM, Shifrin, Laurel (LNG-HBE) < Laurel.Shifrin@lexisnexis.com > wrote: Scott, Dee, Cathie: Please see below. The Steering Committee included this in our budget planning for this year (approved March 25) and we noted that the documentation was coming along well in our status update on July 15). On September 29, during the financial status part of the meeting, we checked on when to expect invoices. Monica indicated that the LegalDocML TC was waiting for the final version of the documentation before approving the two invoices for Grant and Veronique. Apparently we missed the step to approve their contracts. Can we approve via email so that the contracts may be retroactive for the work that was done? Please advise. Thanks, Laurel


  • 9.  Re: Veronique and Grant contract

    Posted 12-22-2015 19:01



    Hi Everyone


    Per Cathie's instructions, please send  your vote to approve the extension to the 2014 contracts and payment of these invoices. 


    Thanks, laurel

    Sent from my iPhone

    On Dec 22, 2015, at 1:46 PM, Cathie Mayo < cathie.mayo@oasis-open.org > wrote:






    Hi Monica,


    Yes, we will be able to process them this year.


    Thanks


    Cathie



    On Tue, Dec 22, 2015 at 1:33 PM, monica.palmirani
    < monica.palmirani@unibo.it > wrote:


    Hi Cathie,

    for better understand the issue see the Veronique and Grant invoices of 2015 in attachment that we intend to approve within this year in order to pay them.

    Yours,
    Monica


    Il 22/12/2015 19:27, Cathie Mayo ha scritto:




    Hi Laurel,


    Sorry I assumed they were the invoices but now see they are the Deliverables.
    I suggest we add them as an additional set of Deliverables under the the existing contract from 2014,



    following the same terms and conditions. The StC can approve the new set of deliverables via email



    and I will add the new Schedule A's to their existing contracts. 



    Thanks


    Cathie



    On Tue, Dec 22, 2015 at 12:22 PM, Shifrin, Laurel (LNG-HBE)
    < Laurel.Shifrin@lexisnexis.com > wrote:



    Hi Cathie –the documents I forwarded from Monica are the ones that would need to be countersigned, for work done in 2015. Since we’re nearly out of 2015, we’re
    not sure about the legality/appropriateness of this. Grant and Veronique did the work, per the contracts but now that we’re ready to approve the invoices, it seems we missed the crucial step of getting the contracts signed.

     
    Thanks, Laurel
     


    From: monica.palmirani [mailto: monica.palmirani@unibo.it ]

    Sent: Tuesday, December 22, 2015 12:12 PM
    To: Cathie Mayo; Shifrin, Laurel (LNG-HBE)
    Cc: Scott McGrath; Dee Schur ( dee.schur@oasis-open.org );
    legalxml-sc@lists.oasis-open.org
    Subject: Re: FW: Veronique and Grant contract


     

    Dear Cathie,

    the contracts refer to year 2015.
    The budget was approved in the beginning of the year.
    I managed the Tara's contract, but I missed to send to you the Grant and Veronique ones, or better I supposed to have done, but I didn't.
    Sorry I mortified.

    Yours,
    Monica


    Il 22/12/2015 18:01, Cathie Mayo ha scritto:




    Hi Laurel,



    ? I am slightly confused.  Do you have the contracts signed by Grant & Veronique that need to



    be countersigned by Laurent?  Or do I need to prepare another contract with information from



    the StC for a description of services to be performed?   The last contracts I have on file are



    from 2014. 



    Thanks


    Cathie ?

    ?


     

    On Tue, Dec 22, 2015 at 8:06 AM, Shifrin, Laurel (LNG-HBE) < Laurel.Shifrin@lexisnexis.com > wrote:
    Scott, Dee, Cathie:

    Please see below. The Steering Committee included this in our budget planning for this year (approved March 25) and we noted that the documentation was coming along well in our status update on July 15). On September 29, during the financial status part of
    the meeting, we checked on when to expect invoices. Monica indicated that the LegalDocML TC was waiting for the final version of the documentation before approving the two invoices for Grant and Veronique. Apparently we missed the step to approve their contracts.
    Can we approve via email so that the contracts may be retroactive for the work that was done? Please advise.

    Thanks, Laurel




  • 10.  RE: Veronique and Grant contract

    Posted 12-22-2015 19:17




    I vote yea. – Jim M
     


    From: legalxml-sc@lists.oasis-open.org [mailto:legalxml-sc@lists.oasis-open.org]
    On Behalf Of Shifrin, Laurel (LNG-HBE)
    Sent: Tuesday, December 22, 2015 2:01 PM
    To: Cathie Mayo <cathie.mayo@oasis-open.org>
    Cc: monica.palmirani <monica.palmirani@unibo.it>; Scott McGrath <scott.mcgrath@oasis-open.org>; Dee Schur (dee.schur@oasis-open.org) <dee.schur@oasis-open.org>; legalxml-sc@lists.oasis-open.org
    Subject: [legalxml-sc] Re: Veronique and Grant contract


     

    Hi Everyone


     


    Per Cathie's instructions, please send  your vote to approve the extension to the 2014 contracts and payment of these invoices. 


     


    Thanks, laurel

    Sent from my iPhone



    On Dec 22, 2015, at 1:46 PM, Cathie Mayo < cathie.mayo@oasis-open.org > wrote:





    Hi Monica,



    Yes, we will be able to process them this year.



    Thanks


    Cathie



     

    On Tue, Dec 22, 2015 at 1:33 PM, monica.palmirani < monica.palmirani@unibo.it > wrote:



    Hi Cathie,

    for better understand the issue see the Veronique and Grant invoices of 2015 in attachment that we intend to approve within this year in order to pay them.

    Yours,
    Monica


    Il 22/12/2015 19:27, Cathie Mayo ha scritto:




    Hi Laurel,



    Sorry I assumed they were the invoices but now see they are the Deliverables.

    I suggest we add them as an additional set of Deliverables under the the existing contract from 2014,



    following the same terms and conditions. The StC can approve the new set of deliverables via email



    and I will add the new Schedule A's to their existing contracts. 



    Thanks


    Cathie



     

    On Tue, Dec 22, 2015 at 12:22 PM, Shifrin, Laurel (LNG-HBE) < Laurel.Shifrin@lexisnexis.com > wrote:



    Hi Cathie –the documents I forwarded from Monica are the ones that would need to be countersigned,
    for work done in 2015. Since we’re nearly out of 2015, we’re not sure about the legality/appropriateness of this. Grant and Veronique did the work, per the contracts but now that we’re ready to approve the invoices, it seems we missed the crucial step of getting
    the contracts signed.
     
    Thanks, Laurel
     


    From: monica.palmirani [mailto: monica.palmirani@unibo.it ]

    Sent: Tuesday, December 22, 2015 12:12 PM
    To: Cathie Mayo; Shifrin, Laurel (LNG-HBE)
    Cc: Scott McGrath; Dee Schur ( dee.schur@oasis-open.org );
    legalxml-sc@lists.oasis-open.org
    Subject: Re: FW: Veronique and Grant contract


     

    Dear Cathie,

    the contracts refer to year 2015.
    The budget was approved in the beginning of the year.
    I managed the Tara's contract, but I missed to send to you the Grant and Veronique ones, or better I supposed to have done, but I didn't.
    Sorry I mortified.

    Yours,
    Monica


    Il 22/12/2015 18:01, Cathie Mayo ha scritto:




    Hi Laurel,



    ? I am slightly confused.  Do you have the contracts signed by Grant & Veronique that need to



    be countersigned by Laurent?  Or do I need to prepare another contract with information from



    the StC for a description of services to be performed?   The last contracts I have on file are



    from 2014. 



    Thanks


    Cathie ?

    ?


     

    On Tue, Dec 22, 2015 at 8:06 AM, Shifrin, Laurel (LNG-HBE) < Laurel.Shifrin@lexisnexis.com > wrote:
    Scott, Dee, Cathie:

    Please see below. The Steering Committee included this in our budget planning for this year (approved March 25) and we noted that the documentation was coming along well in our status update on July 15). On September 29, during the financial status part of
    the meeting, we checked on when to expect invoices. Monica indicated that the LegalDocML TC was waiting for the final version of the documentation before approving the two invoices for Grant and Veronique. Apparently we missed the step to approve their contracts.
    Can we approve via email so that the contracts may be retroactive for the work that was done? Please advise.

    Thanks, Laurel




  • 11.  Re: [legalxml-sc] RE: Veronique and Grant contract

    Posted 12-22-2015 20:06
    Ditto - Jim Price On Dec 22, 2015, at 12:17 PM, Jim McMillan < jmcmillan@ncsc.org > wrote:







    I vote yea. – Jim M
     


    From: legalxml-sc@lists.oasis-open.org [ mailto:legalxml-sc@lists.oasis-open.org ]
    On Behalf Of Shifrin, Laurel (LNG-HBE)
    Sent: Tuesday, December 22, 2015 2:01 PM
    To: Cathie Mayo < cathie.mayo@oasis-open.org >
    Cc: monica.palmirani < monica.palmirani@unibo.it >; Scott McGrath < scott.mcgrath@oasis-open.org >; Dee Schur ( dee.schur@oasis-open.org ) < dee.schur@oasis-open.org >; legalxml-sc@lists.oasis-open.org
    Subject: [legalxml-sc] Re: Veronique and Grant contract


     

    Hi Everyone


     


    Per Cathie's instructions, please send  your vote to approve the extension to the 2014 contracts and payment of these invoices. 


     


    Thanks, laurel

    Sent from my iPhone



    On Dec 22, 2015, at 1:46 PM, Cathie Mayo < cathie.mayo@oasis-open.org > wrote:





    Hi Monica,



    Yes, we will be able to process them this year.



    Thanks


    Cathie



     

    On Tue, Dec 22, 2015 at 1:33 PM, monica.palmirani < monica.palmirani@unibo.it > wrote:



    Hi Cathie,

    for better understand the issue see the Veronique and Grant invoices of 2015 in attachment that we intend to approve within this year in order to pay them.

    Yours,
    Monica


    Il 22/12/2015 19:27, Cathie Mayo ha scritto:




    Hi Laurel,



    Sorry I assumed they were the invoices but now see they are the Deliverables.

    I suggest we add them as an additional set of Deliverables under the the existing contract from 2014,



    following the same terms and conditions. The StC can approve the new set of deliverables via email



    and I will add the new Schedule A's to their existing contracts. 



    Thanks


    Cathie



     

    On Tue, Dec 22, 2015 at 12:22 PM, Shifrin, Laurel (LNG-HBE) < Laurel.Shifrin@lexisnexis.com > wrote:



    Hi Cathie –the documents I forwarded from Monica are the ones that would need to be countersigned,
    for work done in 2015. Since we’re nearly out of 2015, we’re not sure about the legality/appropriateness of this. Grant and Veronique did the work, per the contracts but now that we’re ready to approve the invoices, it seems we missed the crucial step of getting
    the contracts signed.
     
    Thanks, Laurel
     


    From: monica.palmirani [mailto: monica.palmirani@unibo.it ]

    Sent: Tuesday, December 22, 2015 12:12 PM
    To: Cathie Mayo; Shifrin, Laurel (LNG-HBE)
    Cc: Scott McGrath; Dee Schur ( dee.schur@oasis-open.org );
    legalxml-sc@lists.oasis-open.org
    Subject: Re: FW: Veronique and Grant contract


     

    Dear Cathie,

    the contracts refer to year 2015.
    The budget was approved in the beginning of the year.
    I managed the Tara's contract, but I missed to send to you the Grant and Veronique ones, or better I supposed to have done, but I didn't.
    Sorry I mortified.

    Yours,
    Monica


    Il 22/12/2015 18:01, Cathie Mayo ha scritto:




    Hi Laurel,



    ? I am slightly confused.  Do you have the contracts signed by Grant & Veronique that need to



    be countersigned by Laurent?  Or do I need to prepare another contract with information from



    the StC for a description of services to be performed?   The last contracts I have on file are



    from 2014. 



    Thanks


    Cathie ?

    ?


     

    On Tue, Dec 22, 2015 at 8:06 AM, Shifrin, Laurel (LNG-HBE) < Laurel.Shifrin@lexisnexis.com > wrote:
    Scott, Dee, Cathie:

    Please see below. The Steering Committee included this in our budget planning for this year (approved March 25) and we noted that the documentation was coming along well in our status update on July 15). On September 29, during the financial status part of
    the meeting, we checked on when to expect invoices. Monica indicated that the LegalDocML TC was waiting for the final version of the documentation before approving the two invoices for Grant and Veronique. Apparently we missed the step to approve their contracts.
    Can we approve via email so that the contracts may be retroactive for the work that was done? Please advise.

    Thanks, Laurel




  • 12.  Re: [legalxml-sc] Veronique and Grant contract

    Posted 12-22-2015 22:09



    Ditto - Adam Wyner



    On 22 Dec 2015, at 20:05, "Price, Jim" < JPrice@courts.az.gov > wrote:




    Ditto - Jim Price

    On Dec 22, 2015, at 12:17 PM, Jim McMillan < jmcmillan@ncsc.org > wrote:






    I vote yea. – Jim M
     


    From:
    legalxml-sc@lists.oasis-open.org [ mailto:legalxml-sc@lists.oasis-open.org ]
    On Behalf Of Shifrin, Laurel (LNG-HBE)
    Sent: Tuesday, December 22, 2015 2:01 PM
    To: Cathie Mayo < cathie.mayo@oasis-open.org >
    Cc: monica.palmirani < monica.palmirani@unibo.it >; Scott McGrath < scott.mcgrath@oasis-open.org >; Dee Schur ( dee.schur@oasis-open.org )
    < dee.schur@oasis-open.org >;
    legalxml-sc@lists.oasis-open.org
    Subject: [legalxml-sc] Re: Veronique and Grant contract


     

    Hi Everyone


     


    Per Cathie's instructions, please send  your vote to approve the extension to the 2014 contracts and payment of these invoices. 


     


    Thanks, laurel

    Sent from my iPhone



    On Dec 22, 2015, at 1:46 PM, Cathie Mayo < cathie.mayo@oasis-open.org > wrote:





    Hi Monica,



    Yes, we will be able to process them this year.



    Thanks


    Cathie



     

    On Tue, Dec 22, 2015 at 1:33 PM, monica.palmirani < monica.palmirani@unibo.it > wrote:



    Hi Cathie,

    for better understand the issue see the Veronique and Grant invoices of 2015 in attachment that we intend to approve within this year in order to pay them.

    Yours,
    Monica


    Il 22/12/2015 19:27, Cathie Mayo ha scritto:




    Hi Laurel,



    Sorry I assumed they were the invoices but now see they are the Deliverables.

    I suggest we add them as an additional set of Deliverables under the the existing contract from 2014,



    following the same terms and conditions. The StC can approve the new set of deliverables via email



    and I will add the new Schedule A's to their existing contracts. 



    Thanks


    Cathie



     

    On Tue, Dec 22, 2015 at 12:22 PM, Shifrin, Laurel (LNG-HBE) < Laurel.Shifrin@lexisnexis.com > wrote:



    Hi Cathie –the documents I forwarded from Monica are the ones that would need to be countersigned,
    for work done in 2015. Since we’re nearly out of 2015, we’re not sure about the legality/appropriateness of this. Grant and Veronique did the work, per the contracts but now that we’re ready to approve the invoices, it seems we missed the crucial step of getting
    the contracts signed.
     
    Thanks, Laurel
     


    From: monica.palmirani [mailto: monica.palmirani@unibo.it ]

    Sent: Tuesday, December 22, 2015 12:12 PM
    To: Cathie Mayo; Shifrin, Laurel (LNG-HBE)
    Cc: Scott McGrath; Dee Schur ( dee.schur@oasis-open.org );
    legalxml-sc@lists.oasis-open.org
    Subject: Re: FW: Veronique and Grant contract


     

    Dear Cathie,

    the contracts refer to year 2015.
    The budget was approved in the beginning of the year.
    I managed the Tara's contract, but I missed to send to you the Grant and Veronique ones, or better I supposed to have done, but I didn't.
    Sorry I mortified.

    Yours,
    Monica


    Il 22/12/2015 18:01, Cathie Mayo ha scritto:




    Hi Laurel,



    ? I am slightly confused.  Do you have the contracts signed by Grant & Veronique that need to



    be countersigned by Laurent?  Or do I need to prepare another contract with information from



    the StC for a description of services to be performed?   The last contracts I have on file are



    from 2014. 



    Thanks


    Cathie ?

    ?


     

    On Tue, Dec 22, 2015 at 8:06 AM, Shifrin, Laurel (LNG-HBE) < Laurel.Shifrin@lexisnexis.com > wrote:
    Scott, Dee, Cathie:

    Please see below. The Steering Committee included this in our budget planning for this year (approved March 25) and we noted that the documentation was coming along well in our status update on July 15). On September 29, during the financial status part of
    the meeting, we checked on when to expect invoices. Monica indicated that the LegalDocML TC was waiting for the final version of the documentation before approving the two invoices for Grant and Veronique. Apparently we missed the step to approve their contracts.
    Can we approve via email so that the contracts may be retroactive for the work that was done? Please advise.

    Thanks, Laurel




  • 13.  Re: [legalxml-sc] Veronique and Grant contract

    Posted 12-23-2015 01:48



    Hi Cathie: 


    I vote yes as well for both the contract extensions and payment of the invoices. So it looks like this is approved. Thanks so much for the quick response.

    Thanks, Laurel

    On Dec 22, 2015, at 5:09 PM, Wyner, Adam Zachary < azwyner@abdn.ac.uk > wrote:



    Ditto - Adam Wyner



    On 22 Dec 2015, at 20:05, "Price, Jim" < JPrice@courts.az.gov > wrote:




    Ditto - Jim Price

    On Dec 22, 2015, at 12:17 PM, Jim McMillan < jmcmillan@ncsc.org > wrote:






    I vote yea. – Jim M
     


    From:
    legalxml-sc@lists.oasis-open.org [ mailto:legalxml-sc@lists.oasis-open.org ]
    On Behalf Of Shifrin, Laurel (LNG-HBE)
    Sent: Tuesday, December 22, 2015 2:01 PM
    To: Cathie Mayo < cathie.mayo@oasis-open.org >
    Cc: monica.palmirani < monica.palmirani@unibo.it >; Scott McGrath < scott.mcgrath@oasis-open.org >; Dee Schur ( dee.schur@oasis-open.org )
    < dee.schur@oasis-open.org >;
    legalxml-sc@lists.oasis-open.org
    Subject: [legalxml-sc] Re: Veronique and Grant contract


     

    Hi Everyone


     


    Per Cathie's instructions, please send  your vote to approve the extension to the 2014 contracts and payment of these invoices. 


     


    Thanks, laurel

    Sent from my iPhone



    On Dec 22, 2015, at 1:46 PM, Cathie Mayo < cathie.mayo@oasis-open.org > wrote:





    Hi Monica,



    Yes, we will be able to process them this year.



    Thanks


    Cathie



     

    On Tue, Dec 22, 2015 at 1:33 PM, monica.palmirani < monica.palmirani@unibo.it > wrote:



    Hi Cathie,

    for better understand the issue see the Veronique and Grant invoices of 2015 in attachment that we intend to approve within this year in order to pay them.

    Yours,
    Monica


    Il 22/12/2015 19:27, Cathie Mayo ha scritto:




    Hi Laurel,



    Sorry I assumed they were the invoices but now see they are the Deliverables.

    I suggest we add them as an additional set of Deliverables under the the existing contract from 2014,



    following the same terms and conditions. The StC can approve the new set of deliverables via email



    and I will add the new Schedule A's to their existing contracts. 



    Thanks


    Cathie



     

    On Tue, Dec 22, 2015 at 12:22 PM, Shifrin, Laurel (LNG-HBE) < Laurel.Shifrin@lexisnexis.com > wrote:



    Hi Cathie –the documents I forwarded from Monica are the ones that would need to be countersigned,
    for work done in 2015. Since we’re nearly out of 2015, we’re not sure about the legality/appropriateness of this. Grant and Veronique did the work, per the contracts but now that we’re ready to approve the invoices, it seems we missed the crucial step of getting
    the contracts signed.
     
    Thanks, Laurel
     


    From: monica.palmirani [mailto: monica.palmirani@unibo.it ]

    Sent: Tuesday, December 22, 2015 12:12 PM
    To: Cathie Mayo; Shifrin, Laurel (LNG-HBE)
    Cc: Scott McGrath; Dee Schur ( dee.schur@oasis-open.org );
    legalxml-sc@lists.oasis-open.org
    Subject: Re: FW: Veronique and Grant contract


     

    Dear Cathie,

    the contracts refer to year 2015.
    The budget was approved in the beginning of the year.
    I managed the Tara's contract, but I missed to send to you the Grant and Veronique ones, or better I supposed to have done, but I didn't.
    Sorry I mortified.

    Yours,
    Monica


    Il 22/12/2015 18:01, Cathie Mayo ha scritto:




    Hi Laurel,



    ? I am slightly confused.  Do you have the contracts signed by Grant & Veronique that need to



    be countersigned by Laurent?  Or do I need to prepare another contract with information from



    the StC for a description of services to be performed?   The last contracts I have on file are



    from 2014. 



    Thanks


    Cathie ?

    ?


     

    On Tue, Dec 22, 2015 at 8:06 AM, Shifrin, Laurel (LNG-HBE) < Laurel.Shifrin@lexisnexis.com > wrote:
    Scott, Dee, Cathie:

    Please see below. The Steering Committee included this in our budget planning for this year (approved March 25) and we noted that the documentation was coming along well in our status update on July 15). On September 29, during the financial status part of
    the meeting, we checked on when to expect invoices. Monica indicated that the LegalDocML TC was waiting for the final version of the documentation before approving the two invoices for Grant and Veronique. Apparently we missed the step to approve their contracts.
    Can we approve via email so that the contracts may be retroactive for the work that was done? Please advise.

    Thanks, Laurel




  • 14.  Re: Veronique and Grant contract

    Posted 12-22-2015 20:43
    I vote yes for both: extension and invoices. Thanks, -mp Il 22/12/2015 20:00, Shifrin, Laurel (LNG-HBE) ha scritto: Hi Everyone Per Cathie's instructions, please send  your vote to approve the extension to the 2014 contracts and payment of these invoices.  Thanks, laurel Sent from my iPhone On Dec 22, 2015, at 1:46 PM, Cathie Mayo < cathie.mayo@oasis-open.org > wrote: Hi Monica, Yes, we will be able to process them this year. Thanks Cathie On Tue, Dec 22, 2015 at 1:33 PM, monica.palmirani < monica.palmirani@unibo.it > wrote: Hi Cathie, for better understand the issue see the Veronique and Grant invoices of 2015 in attachment that we intend to approve within this year in order to pay them. Yours, Monica Il 22/12/2015 19:27, Cathie Mayo ha scritto: Hi Laurel, Sorry I assumed they were the invoices but now see they are the Deliverables. I suggest we add them as an additional set of Deliverables under the the existing contract from 2014, following the same terms and conditions. The StC can approve the new set of deliverables via email and I will add the new Schedule A's to their existing contracts.  Thanks Cathie On Tue, Dec 22, 2015 at 12:22 PM, Shifrin, Laurel (LNG-HBE) < Laurel.Shifrin@lexisnexis.com > wrote: Hi Cathie –the documents I forwarded from Monica are the ones that would need to be countersigned, for work done in 2015. Since we’re nearly out of 2015, we’re not sure about the legality/appropriateness of this. Grant and Veronique did the work, per the contracts but now that we’re ready to approve the invoices, it seems we missed the crucial step of getting the contracts signed.   Thanks, Laurel   From: monica.palmirani [mailto: monica.palmirani@unibo.it ] Sent: Tuesday, December 22, 2015 12:12 PM To: Cathie Mayo; Shifrin, Laurel (LNG-HBE) Cc: Scott McGrath; Dee Schur ( dee.schur@oasis-open.org ); legalxml-sc@lists.oasis-open.org Subject: Re: FW: Veronique and Grant contract   Dear Cathie, the contracts refer to year 2015. The budget was approved in the beginning of the year. I managed the Tara's contract, but I missed to send to you the Grant and Veronique ones, or better I supposed to have done, but I didn't. Sorry I mortified. Yours, Monica Il 22/12/2015 18:01, Cathie Mayo ha scritto: Hi Laurel, ? I am slightly confused.  Do you have the contracts signed by Grant & Veronique that need to be countersigned by Laurent?  Or do I need to prepare another contract with information from the StC for a description of services to be performed?   The last contracts I have on file are from 2014.  Thanks Cathie ? ?   On Tue, Dec 22, 2015 at 8:06 AM, Shifrin, Laurel (LNG-HBE) < Laurel.Shifrin@lexisnexis.com > wrote: Scott, Dee, Cathie: Please see below. The Steering Committee included this in our budget planning for this year (approved March 25) and we noted that the documentation was coming along well in our status update on July 15). On September 29, during the financial status part of the meeting, we checked on when to expect invoices. Monica indicated that the LegalDocML TC was waiting for the final version of the documentation before approving the two invoices for Grant and Veronique. Apparently we missed the step to approve their contracts. Can we approve via email so that the contracts may be retroactive for the work that was done? Please advise. Thanks, Laurel