emix-comment

 View Only

Comment on Public Review Draft 4 of EMIX Standard

  • 1.  Comment on Public Review Draft 4 of EMIX Standard

    Posted 10-18-2011 18:33
    The following comment relates to the difference tracked version of the
    EMIX draft standard
    (http://docs.oasis-open.org/emix/emix/v1.0/csprd04/emix-v1.0-csprd04-dif
    f.pdf).



    In the previous version of the standard, lines 867 - 870 read "An
    example is the sale of 1 MW tomorrow between 3 and 5 PM that may be
    measured every 15 minutes (The energy is 1 MWh). The power in each 15
    minute Interval is 1 MW and the Energy in each 15 minute Interval is
    0.25 MWh."



    In the latest version of the standard, lines 867 - 870 were changed to
    "An example is the sale of 1 MW tomorrow between 3 and 5 PM that may be
    measured every 15 minutes (The energy is 1 MWh). The power in each 15
    minute Interval is 2 MW and the Energy in each 15 minute Interval is
    0.25 MWh."



    I believe that the wrong "1" was changed and that the sentences should
    actually read "An example is the sale of 1 MW tomorrow between 3 and 5
    PM that may be measured every 15 minutes (The energy is 2 MWh). The
    power in each 15 minute Interval is 1 MW and the Energy in each 15
    minute Interval is 0.25 MWh."



    Thank you,



    Allen Jones



    ________________________________________________________________________
    _____________

    Allen Jones | Schneider Electric | Buildings Business |
    Offer Management | Project Manager
    Phone: +1 804 727 3980 | Fax: +1 804 727 3989 | Mobile: +1 804 564
    5923
    Email: allen.jones@schneider-electric.com
    <mailto:allen.jones@buildings.schneider-electric.com> | Site:
    www.schneider-electric.com/buildings
    <http://www.schneider-electric.com/buildings> | Address: 1100
    Boulders Pkwy, Suite 330, Richmond, VA 23225

    *** Please consider the environment before printing this e-mail