OASIS Universal Business Language (UBL) TC

  • 1.  Joint SC call 2004.04.13

    Posted 04-12-2004 17:41
     MHonArc v2.5.0b2 -->
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    

    ubl message

    [Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]


    Subject: Joint SC call 2004.04.13


    Hello UBL TC,
    
    Remember that we are having a joint UBL SC call Tuesday 8 a.m. San
    Francisco daylight time (15h00 UTC, 16h00 London, 17h00 Berlin,
    23h00 Perth).
    
       #############################################
       STANDING INFORMATION FOR UBL CONFERENCE CALLS
       U.S. domestic toll-free number: (866)839-8145
       Int. access/caller paid number: (865)524-6352
       Access code: 5705229
       #############################################
    
    Agenda:
    
     - Schema check
    
     - Status report on missing pieces:
    
          doc/UBL-CL-1.0.pdf (Appendix E)
          doc/UBL-CM-1.0.pdf (Appendix B.7)
          doc/UBL-NDR-1.0.pdf (Appendix B.4)
          doc/UBL-credits-1.0.pdf (Front matter)
    
          Appendix C: Formatting Specifications (all)
          Appendix G: RELAX NG Specification (all)
          Appendix H: Future Work Items (all)
    
          Links to pdf files for instances (see Appendix D)
    
       Note that I can probably contribute an editorial review for
       some or all of the prose pieces, but I will need to know the
       location of the latest drafts and where each one stands in
       terms of completion.  Please be ready with these items of
       information at the call Tuesday.
    
     - Schedule review; here's what I posted last week:
    
          Tue 4/13 Packaging review; acceptance of all
              schema-dependent deliverables except FS
    
          Wed 4/14 NDR, CL, and CM sign-off
    
          Thu 4/15 Master doc revision including doc/ pieces
    
          Fri 4/16 Package review
    
          Mon 4/19 FS delivery and inclusion in the final build
    
          Tue 4/20 Sign-off on the 1.0 package
    
          Fri 4/23 Submission of CD for balloting
    
          Fri 4/30 Completion of CD balloting
    
    Jon
    


    [Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]