OASIS Darwin Information Typing Architecture (DITA) TC

Stage 3 review process: Responsibilities of proposal owner and reviewers

  • 1.  Stage 3 review process: Responsibilities of proposal owner and reviewers

    Posted 06-25-2013 18:18
    Review of Stage 3 Proposals Two or more individuals who regularly attend the weekly meetings of the DITA TC must review each Stage 3 proposal before it is submitted to the TC for discussion and vote. This purpose of this phase in the process is to ensure that stage 3 proposals have undergone QA and a level of review before being considered by the TC. It also ensures that the required versions of the proposal (DITA, HTML, and PDF) are ready for submission to the TC. Proposal owner tasks Upload the proposal to Kavi in DITA, HTML, and PDF format. Notify the TC co-chairs that reviewers are needed (After reviewers are assigned) E-mail the assigned reviewers directly. The e-mail should have a clear subject title (for example, Stage 3 review: Proposal X is ready for your consideration ) and provide links to the proposal to be reviewed. Incorporate changes into the proposal and spec topics. Reviewer tasks Reviewers need a minimum of one week to conduct their reviews. Reviewers are requested to complete their reviews within a maximum of two weeks. Reviewers should consider the following content areas and points: Completeness Determine whether the proper template has been used Determine whether the proposal is complete ( stage 3 template ) Determine whether the proposal is available in the following forms: ZIP of DITA source HTML (Must contain all proposal content, including new and modified spec topics, in a single HTML file) PDF (Must contain all proposal content, including new and modified spec topics, in a single PDF file) Determine whether the ZIP of DITA files includes any extraneous files (The reason for the single HTML and single PDF file is to make it as easy as possible for TC members to link on a link in the TC agenda and open the proposal during TC meetings.) Proposal content Read the proposal carefully and critically. Determine whether questions or points that arose during previous TC discussion of the proposal have been satisfactorily addressed. Review the minutes at which the proposal was discussed at the stage 2 level so that you are aware of any questions or points. (The stage-3 proposal should contain a link to these minutes.) Spec topics Read new or modified spec topics carefully and critically. Consider the following points: Is the correct terminology used? Are the topics free of typos and grammatical errors? Are the terms should, should not, must, must not, and may used correctly? Is the content clear and easy to read? If you were reading this content directly out of the specification, would you consider it a complete description of the new feature or element? If possible, test all new or modified code examples. At a minimum, test to ensure the code examples are well-formed. Assess the quality of the examples. Ideally, they should be both informative and non-trivial. -- Best, Kris Kristen James Eberlein Principal consultant, Eberlein Consulting Co-chair, OASIS DITA Technical Committee Charter member, OASIS DITA Adoption Committee www.eberleinconsulting.com +1 919 682-2290; kriseberlein (skype)