OASIS Static Analysis Results Interchange Format (SARIF) TC

  • 1.  Status of e-ballot #3

    Posted 03-17-2019 22:59
    Here is the up-to-the-minute status of e-ballot #3. This is the ballot that will open this coming Friday. The currently open ballot is #2.   The following issues will be on the ballot. There are change drafts available for all of them, and they are all merged into the provisional draft:   Issue #179: Introduce toolComponent/driver/extensions (e-ballot: review change draft; design change was previously approved) Issue #336: toolComponent property changes (e-ballot: review change draft. I have no idea if we pre-approved these individual property changes) (combined change draft with #179)   More to come.   Larry