OASIS Topology and Orchestration Specification for Cloud Applications (TOSCA) TC

Groups - TOSCA-v2.0-wd01-rev05-operation-definition-refinement-assignment-draft.docx uploaded

  • 1.  Groups - TOSCA-v2.0-wd01-rev05-operation-definition-refinement-assignment-draft.docx uploaded

    Posted 08-26-2019 21:19
    Document Name : TOSCA-v2.0-wd01-rev05-operation-definition-refinement-assignment-draft.docx Description A draft of how we could specify the definition, refinement and assignment for operations, w.r.t. their parameter defintion/refinement/assignment and implementation definition/change.

    LEFT TODO:
    - type derivations rules
    - schema refinement rules
    - requirement refinement rules
    - artifact refinement rules
    - attribute assignments
    - parameter assignments
    - make the difference between outgoing parameter assignments and incoming parameter to attribute mapping
    - capability assignment rules
    - requirement assignment rules Download Latest Revision Public Download Link Submitter : Dr. Calin Curescu Group : OASIS Topology and Orchestration Specification for Cloud Applications (TOSCA) TC Folder : Working Documents Date submitted : 2019-08-26 14:18:06 Revision : 1