OASIS Energy Interoperation TC

  • 1.  Changes between PR and CD as submittedq

    Posted 11-28-2010 12:26

    The Committee Draft as submitted is different in several ways from the Public Review as released. The OASIS staff performed their quality control and removed some non-standard acknowledgements as well as the “Note to Reviewers” page. The note to reviewers included the highlights that the committee requested.

    <sigh />

    tc


    “It is difficult to get a man to understand something, when his salary depends upon his not understanding it” -- Upton Sinclair.


    Toby Considine
    TC9, Inc

    OASIS Technical Advisory Board
    TC Chair: oBIX & WS-Calendar

    TC Editor: EMIX, EnergyInterop

    U.S. National Inst. of Standards and Tech. Smart Grid Architecture Committee

      

    Email: Toby.Considine@gmail.com
    Phone: (919)619-2104

    http://www.tcnine.com/
    blog: www.NewDaedalus.com



  • 2.  Re: [energyinterop] Changes between PR and CD as submittedq

    Posted 11-29-2010 03:54
    Hmmm ... didn't touch any acknowledgements, and the 'note to reviewers' was included in the notice rather than the spec itself?

    Mary 



    On Nov 28, 2010, at 7:24 AM, Toby Considine wrote:

    The Committee Draft as submitted is different in several ways from the Public Review as released. The OASIS staff performed their quality control and removed some non-standard acknowledgements as well as the “Note to Reviewers” page. The note to reviewers included the highlights that the committee requested.
    <sigh />
    tc

    “It is difficult to get a man to understand something, when his salary depends upon his not understanding it” -- Upton Sinclair.

    Toby Considine
    TC9, Inc
    OASIS Technical Advisory Board
    TC Chair: oBIX & WS-Calendar
    TC Editor: EMIX, EnergyInterop
    U.S. National Inst. of Standards and Tech. Smart Grid Architecture Committee

      
    Email: Toby.Considine@gmail.com
    Phone: (919)619-2104



  • 3.  RE: [energyinterop] Changes between PR and CD as submittedq

    Posted 11-29-2010 11:16
      |   view attached

    Attachment(s)

    pdf
    CD01 Note.pdf   2.89 MB 1 version


  • 4.  Re: [energyinterop] Changes between PR and CD as submittedq

    Posted 11-29-2010 14:22
    Hi Toby,

      Secretaries aren't listed on the cover page. You could always add something special to the acknowledgements section if the TC thought it appropriate. The spec doesn't include such notes. Hopefully people will pass around the notice rather than the document since it contains all of the instructions for commenting.

    Best regards,

    Mary






    On Nov 29, 2010, at 6:14 AM, Considine, Toby (Campus Services IT) wrote:

    Well, I just checked to make sure I uploaded the right stuff…
    The Word and the PDF in
    CSD URI
    Each include a listing for the Secretary…
    Page 4, after the Notices is “Notes for Reviewers”. The TC voted that the Public Review draft  must include internal comments to direct reviewers, to get wider input. It was also noted that the document was likely to be passed around, and not just forwarded as per the cover letter announcing its availability.
    tc

    "It is the theory that decides what can be observed."   - Albert Einstein

    Toby Considine
    Chair, OASIS oBIX Technical Committee
    U.S. National Inst. of Standards and Tech. Smart Grid Architecture Committee
    Facilities Technology Office
    University of North Carolina
    Chapel Hill, NC
      
    Email: Toby.Considine@ unc.edu
    Phone: (919)962-9073
    From: Mary McRae [mailto:mary.mcrae@oasis-open.org] 
    Sent: Sunday, November 28, 2010 10:54 PM
    To: Toby.Considine@gmail.com
    Cc: energyinterop@lists.oasis-open.org
    Subject: Re: [energyinterop] Changes between PR and CD as submittedq
    Hmmm ... didn't touch any acknowledgements, and the 'note to reviewers' was included in the notice rather than the spec itself?
    Mary 


    On Nov 28, 2010, at 7:24 AM, Toby Considine wrote:


    The Committee Draft as submitted is different in several ways from the Public Review as released. The OASIS staff performed their quality control and removed some non-standard acknowledgements as well as the “Note to Reviewers” page. The note to reviewers included the highlights that the committee requested.
     
    <sigh />
     
    tc
     

    “It is difficult to get a man to understand something, when his salary depends upon his not understanding it” -- Upton Sinclair.

    Toby Considine
    TC9, Inc
    OASIS Technical Advisory Board
    TC Chair: oBIX & WS-Calendar
    TC Editor: EMIX, EnergyInterop
    U.S. National Inst. of Standards and Tech. Smart Grid Architecture Committee


      
    Email: Toby.Considine@gmail.com
    Phone: (919)619-2104
     
     
    <CD01 Note.pdf>