Can someone from the TC tell me what the schedule is for the Errata? Due to the adoption decisions being made in the state of Mass., I would hope the completion date is in June/July or sooner. Rich Rich Schwerdtfeger Distinguished Engineer, SWG Accessibility Architect/Strategist Chair, IBM Accessibility Architecture Review Board blog:
http://www-106.ibm.com/developerworks/blogs/dw_blog.jspa?blog=441 "Two roads diverged in a wood, and I - I took the one less traveled by, and that has made all the difference.", Frost