OASIS Universal Business Language (UBL) TC

Outcomes of joint SC call 2004.04.06

  • 1.  Outcomes of joint SC call 2004.04.06

    Posted 04-06-2004 16:54
     MHonArc v2.5.0b2 -->
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    

    ubl message

    [Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]


    Subject: Outcomes of joint SC call 2004.04.06


    Attendance
    
       Jon Bosak
       Stephen Green
       Michael Grimley
       Anne Hendry
       David Kruppke
       Monica Martin
       Bill Meadows
       Tim McGrath
       Marion Royal
       Sylvia Webb
    
    1. Location of qualified BBIE property element declarations
    
       Issue: The qualified BBIE property elements are defined in the
       CBC module.  In earlier discussions, we thought that these
       would go in the CAC module, or some combination of CAC and
       individual document schemas
    
       Resolution: This is a substantive issue that's too late to
       debate for 1.0.  Put it on the work list for 1.1.  A change
       should not affect instances.
    
    2. Schema validation
    
       Issue: The schemas need to be validated.
    
       Status: Chee-Kai Chin sent comments to Bill, Stephen, and Tim
       indicating that validation went OK for him.  XML Spy sees no
       problems.  Jon encountered a problem with MSV that appears to
       have something to do with his setup.  Jessica needs to run the
       schemas through her validation suite.
    
    3. GEFEG line
    
       The line in the schemas mentioning GEFEG needs to be removed.
    
    4. "Data Type" vs. "Datatype"
    
       Decision: We will use "datatype" (one word) throughout except
       when referring to CCTS in documentation and in the NDR
       document, because CCTS uses "data types."
    
       Actions:
    
        - No change to the schemas
    
        - In models:
    
           - Change file named UnSpecialisedDataTypes to
             UnspecialisedDatatypes
    
           - Add "-1.0" to file names of UBL-CoreComponentTypes,
             UBL-SpecialisedDataTypes, and UBL-UnSpecialisedDataTypes
             (which should be UBL-UnspecialisedDatatypes as above)
    
    5. codeName for name
    
       Issue: The supplementary component "codeName" in the codelist
       schemas should be "name" per the CCT schema.
    
       Actions:
    
        - Change this in the schema generator
    
        - Change this in the instances and call the result draft 5
          [but don't name the files that way!]
    
    6. Description of UBLAmountType
    
       Issue: The description of UBLAmountType in the model for
       specialised datatypes does not appear in the schema.
    
       Action: Change the schema generator to pick up the description.
    
    7. Change columns in spreadsheets
    
       Action: Tim will delete the change columns in the spreadsheets
       and generate the OpenOffice versions.
    
    8. Draft identifiers
    
       Issue: Time to remove the draft labels in preparation for final
       packaging.
    
       Actions:
    
        - Remove the "draft" labels in schema and instance file names
          and namespace references (David)
    
        - Same for the CC Parameters schema (David, by hand)
    
        - Change the SDT spreadsheet accordingly (Tim)
    
    9. Scheduling
    
       David will deliver final schemas at 15h00 Wednesday in Berlin
       and send them to Stephen; Stephen will forward them to the list
       so that Jessica can validate them before our previously
       scheduled call at 17h00 in Berlin (08h00 in San Francisco and
       11h00 in Washington).
    
    ================
    PACKAGING REVIEW
    ================
    
    These items were taken from the file missing.txt in the latest
    master doc draft.
    
     - Review procurement process {5}
    
          Stephen has looked at this; Bill will review
    
     - Revise schema intro {6 intro para}
    
          Done.
    
     - Review schema descriptions and fill in missing details as
       indicated {6.1, 6.2, 6.3}
    
          Jon will put the master doc on the web site so that Lisa can
          download it.
    
     - Create diagram for {6.4}
    
          Lisa will send the visio file to Tim, who will complete it
          to reflect the schema dependencies in 1.0.
    
     - Review methodology {App B}
    
          Stephen will review {B.1}; the rest is either OK or is in
          process.
    
     - Regenerate diagram of conceptual model to correct overlapping
       labels {Fig B-2, App B.2.1}
    
          Tim is working on this.
    
     - Write description of dependency diagrams {B.2.4}
    
          Tim is working on this.
    
     - Review spreadsheet descriptions in {B.3}
    
          Done.
    
     - Code list paper {App E}
    
          (Didn't discuss this.)
    
     - NDR document for 1.0 {App B.4}
    
          Lisa is trying to contact Mark about this.
    
     - Final schemas {6}
    
          In progress.
    
     - Appropriate GEFEG URL and description of GEFEG tool
       used in final schema generation {B.5}
    
          Done.
    
     - Customization guidelines {B.7}
    
          (Didn't discuss this.)
    
     - Review and update release notes {App A}
    
          Bill is working on this.
    
     - (NEW) Add an appendix on work items for future development
    
          Tim will generate some prose and send to Jon for further
          work.
    


    [Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]