    WSIA Customization Sub-committee Conference Call, May 8, 2002
    
    Charter
    =======
    The committee will prepare a charter and present it to the WSIA group.
    
    The charter timeline will follow the one sketched in the F2F,
    namely:
    June joint F2F:      review draft of technical requirements/sketch   
                         of a spec/architecture/model 
    July release w/WSRP: 1st draft of tech requirements 
    3Q 2002:             1st draft spec 
    4Q 2002:             impl 
    1Q 2003:             Final draft of 1.0 spec 
    
    Charlie will distribute a first version of the charter along the
    lines of the one used for the Joint WSRP/WSIA Committee.
    
    Steps and Milestones
    ====================
    
    A discussion arose around the action plan towards the F2F.
    
    It was agreed that considerable work has been done so far in
    the Customized use case, which enables us to move forward
    based on the work done.
    
    There was also a feel that unlike the Embedded case, there 
    still isn't complete consensus as to the scope and problems 
    solved within the Customized use case, and that taking half 
    a step back to fine-tune those can be beneficial, as long
    as it enables us to meet our required timeline.
    
    Thus, the next step is to define and refine concrete 
    sub-scenarios that capture particular functionality required 
    as part of the scenario (e.g., specifically - price 
    customization in the Memory Configurator presented in 
    the F2F). We can use this list as a basis for discussion 
    in the architectural conversations.
    
    This leads to the following action plan:
    
    May 15 - Documented List of Sub-Scenarios
    May 22 - Detailed List of Sub-Scenarios
    May 24 - Discussion with WSIA team
    
    May 29 - High-Level Architectural Approaches
    June 3 - Documented Architectural Approaches
    June 5 - Discussion with WSIA team
    
    June 10 - High-Level Technical Requirements
    June 17 - Detailed Technical Requirements
    F2F     - Discussion with WSIA team 
    
    Tim volunteered to help with editing the sub-scenarios
    into a document.
    
    Charlie suggested that the second F2F day will be 
    dedicated to the Customized use case.
    
    Eilon will take a first crack at a sub-scenario
    to get a discussion around the level of detail.
    
    Further discussion around sub-scenarios will be carried via 
    e-mail until next week's meeting.
    
    Regards,
    Eilon
    
    
    
    