OASIS Energy Interoperation TC

 View Only

Groups - IRC_NAESB_BPMs (Visio) (IRC Smart Grid Standards - DR Business Processes-numbered-2010-10-15-EITC Group Mapping.vsd) uploaded

  • 1.  Groups - IRC_NAESB_BPMs (Visio) (IRC Smart Grid Standards - DR Business Processes-numbered-2010-10-15-EITC Group Mapping.vsd) uploaded

    Posted 10-15-2010 20:54
    Minor update
    
     -- Edgardo Luzcando
    
    The document revision named IRC_NAESB_BPMs (Visio) (IRC Smart Grid
    Standards - DR Business Processes-numbered-2010-10-15-EITC Group
    Mapping.vsd) has been submitted by Edgardo Luzcando to the OASIS Energy
    Interoperation TC document repository.  This document is revision #1 of IRC
    Smart Grid Standards - DR Business Processes-numbered-2010-10-01-EITC Group
    Mapping.vsd.
    
    Document Description:
    Wholesale Updated Business Process diagrams with the first attempt at
    categorizing each IRC interaction according to the EITC Service Name Groups
    (Specific Service Names mapping is pending).
    
    View Document Details:
    http://www.oasis-open.org/committees/document.php?document_id=39845
    
    Download Document:  
    http://www.oasis-open.org/committees/download.php/39845/IRC%20Smart%20Grid%20Standards%20-%20DR%20Business%20Processes-numbered-2010-10-15-EITC%20Group%20Mapping.vsd
    
    Revision:
    This document is revision #1 of IRC Smart Grid Standards - DR Business
    Processes-numbered-2010-10-01-EITC Group Mapping.vsd.  The document details
    page referenced above will show the complete revision history.
    
    
    PLEASE NOTE:  If the above links do not work for you, your email application
    may be breaking the link into two pieces.  You may be able to copy and paste
    the entire link address into the address field of your web browser.
    
    -OASIS Open Administration